Abbott VP 2000 Service Manual page 84

Processor
Hide thumbs Also See for VP 2000:
Table of Contents

Advertisement

Installation
4-16
Installing Fluid-Flow Lines
Locate the two (2) lengths of tubing—each about 18 inches
long—extending from beneath the unit. One is marked
"Drain" and the other is marked "Water In".
NOTE: Both tubings can be routed under the unit
to exit from any side of the Abbott VP 2000
Processor.
1. Route the "Drain" line to a sink or waste drain.
NOTE: Even if only a captive fluid is to be used
and do not intend to use an external water supply,
the drain line still needs to be installed as an
"overflow" line.
2. Route the "Water-In" line to the DI water supply. If using
a non-pressurized water supply (i.e., a carboy containing
DI water), make sure that the carboy is elevated to provide
for gravity flow.
3. Open the Fluid-Flow Installation Kit and remove the two
(2) lengths of extension tubing and three (3) hose clamps.
Figure 4.1: Tubing Installation
Abbott VP 2000™ Proceessor Service Manual
30-608308/R1—September 2008
Section 4

Advertisement

Table of Contents
loading

Table of Contents