Abbott VP 2000 Service Manual page 75

Processor
Hide thumbs Also See for VP 2000:
Table of Contents

Advertisement

Section 4
System Software Installation
Task
Software installed properly
Communication between PC and
instrument verified
Verification of Installation
Task
Initial Power Up sequence
Verify Dryer temperature is achieved
Verify that Heater Module Basins achieve
temperature in 30 minutes. Use water in the
Heater Basin Vessels for test purposes.
Execute the VP2KQC.vp2 program to verify
the Robotic Arm move to every location on
the instrument.
Abbott VP 2000™ Processor Service Manual
30-608308/R1—September 2008
Abbott VP 2000 Processor Installation Checklist
Reference
Latest TSB/ISA
Section 4, Instrument Installation,
Installation of Instrument Software
Reference
Section 4, Troubleshooting, Built-In Test,
Purpose of the Test, Step 2
Abbott VP 2000 User Guide, Section 6,
Service and Maintenance, Manually
Changing Dryer Station Temperature
Abbott VP 2000 User Guide, Section 4,
Routing Operations, Manually
Controlling the Basin Heaters
Abbott VP 2000 User Guide, Section 6,
Service and Maintenance, Running a
Robotics Test
Complete
Complete
4-7