Fitting The Source Enclosure To The Instrument - Waters Xevo TQD IVD Overview And Maintenance Manual

Table of Contents

Advertisement

5.
Using both hands, grasp the source enclosure and lift it vertically off the two supporting
studs on the source adaptor housing.
Cable storage positions
6.
Store the cables neatly by plugging them into the cable-storage positions on the rear of the
source enclosure.
4.6.2

Fitting the source enclosure to the instrument

4.6.2.1
Required material
Chemical-resistant, powder-free gloves
Warning:
To avoid personal contamination with biologically hazardous, or toxic materials, and to
avoid spreading contamination to uncontaminated surfaces, wear clean, chemical-resistant,
powder-free gloves when working with the source components.
To fit the source enclosure:
1.
Using both hands, fit the source enclosure onto the two supporting studs on the source
adaptor housing.
2.
Close the source enclosure.
3.
Connect the probe adjuster and options cables to the instrument's connectors.
Source enclosure
September 7, 2016, 715003560IVD Rev. C
Supporting stud
TP03164
Page 46

Advertisement

Table of Contents
loading

Table of Contents