Purging The Infusion Pump; Rebooting The Mass Spectrometer's Software - Waters Xevo TQD IVD Overview And Maintenance Manual

Table of Contents

Advertisement

To install the reservoir bottles:
1.
Remove the reservoir bottle caps.
2.
Screw the reservoir bottles onto the instrument, as shown below.
3.
For each reservoir bottle, ensure that the end of the solvent delivery tube is positioned so
that it is close to, but does not touch, the bottom of the bottle.
To install low-volume vials:
1.
If a standard reservoir bottle is fitted, remove it.
2.
Screw the low-volume adaptor into the manifold and tighten it.
3.
Screw the low-volume vial into the adaptor.
4.
For each low-volume vial, ensure that the end of the solvent delivery tube is positioned so
that it approaches, but does not touch, the bottom of the vial.
2.2.2

Purging the infusion pump

Whenever you replace a solution bottle, purge the infusion pump with the solution that you intend
to use next. See the mass spectrometer's online Help for details.
Requirement:
Ensure that the end of the tubing is fully submerged in the solvent in the wash
reservoir.
Tip:
Depending on the solutions used, the instrument's solvent delivery system can require more
than one purge cycle to minimize carryover.
2.3

Rebooting the mass spectrometer's software

Pressing the reset button causes the instrument's software to reboot.
Reboot when either of these conditions applies:
Immediately following a software upgrade.
MassLynx software fails to initialize.
September 7, 2016, 715003560IVD Rev. C
Page 34
TP03410

Advertisement

Table of Contents
loading

Table of Contents