Fitting The Ion Block Assembly To The Source Assembly; Cleaning The Ion Block Assembly; Disassembling The Source Ion Block Assembly - Waters Xevo TQD IVD Overview And Maintenance Manual

Table of Contents

Advertisement

2.
Fit the extraction cone onto the ion block.
3.
Rotate the 2 PEEK extraction cone retainer clips to secure the extraction cone, then use the
combined 2.5-mm Allen wrench and cone extraction tool to tighten the retainer clip securing
screws.
4.19.5

Fitting the ion block assembly to the source assembly

4.19.5.1
Required materials
Chemical-resistant, powder-free gloves
Combined 2.5-mm Allen wrench and cone extraction tool
Warning:
To avoid personal contamination with biohazards or toxic materials, and to avoid
spreading contamination to uncontaminated surfaces, wear clean, chemical-resistant, powder-free
gloves when working with the source components.
Warning:
enclosure open; the ESI probe tip is sharp.
Notice:
To avoid recontaminating the ion block assembly, wear clean chemical-resistant,
powder-free gloves during this procedure.
To fit the ion block assembly to the source assembly:
1.
Fit the ion block assembly onto the PEEK ion block support.
2.
Use the combined 2.5-mm Allen wrench and cone extraction tool to fit and then slowly
tighten the 4 ion block assembly securing screws sequentially and in small increments.
3.
Open the source isolation valve (see
4.
Close the source enclosure.

4.20 Cleaning the ion block assembly

Clean the ion block assembly when cleaning the sample cone, cone gas nozzle, and extraction
cone fails to increase signal sensitivity.
4.20.1

Disassembling the source ion block assembly

4.20.1.1
Required materials
Chemical-resistant, powder-free gloves
Combined 2.5-mm Allen wrench and cone extraction tool
O-ring removal kit
Needle-nose pliers
To avoid puncture wounds, take great care while working with the source
September 7, 2016, 715003560IVD Rev. C
page
47).
Page 76

Advertisement

Table of Contents
loading

Table of Contents