Waters ACQUITY Isocratic Solvent Manager Overview And Maintenance Manual page 24

Table of Contents

Advertisement

1 ACQUITY Isocratic Solvent Manager
4.
The primary piston delivers solvent to the accumulator, the vent valve,
and the inline 22-µL filter during transfer.
5.
The accumulator piston delivers solvent, under pressure, to the vent
valve and the inline 22-µL filter.
6.
From the inline 22-µL filter, the solvent flows to the UPC
7.
The UPC
then splits the diluted mobile phase into two streams, one flowing to the
convergence manager and the other to the QDa detector.
Flow through the ISM with an installed UPC
kit:
ELS
detector
Convergence
manager
Solvent flows through the ISM with an installed UPC
follows:
1.
Solvent is degassed through the in-line vacuum degasser.
2.
The solvent is filtered before entering the primary check valve.
3.
The filtered solvent flows through the primary check valve and into the
piston chamber.
24
September 26, 2013, 715004208 Rev. A
2
flow-splitter adds the ISM solvent to the LC mobile phase and
Optical
detector
2
2
Triple-Detection Flow-splitter
QDa detector
2
Flow-splitter kit as
Flow-splitter.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ACQUITY Isocratic Solvent Manager and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF