IDS1000-A Air-Cooled Container Data Center
All-in-One Maintenance Guide

3.3.6 Other Systems

Table 3-13 Quarterly maintenance checklist for other systems
Item
Containers

3.4 Semi-annual Maintenance

3.4.1 Power Supply and Distribution System

Table 3-14 Semi-annual maintenance checklist for the power supply and distribution system
Item
PDC
UPS
ATS
Issue 01 (2016-01-10)
Method
Expected
Result
Check the
The container
container.
is clean.
The container
is free from
rust.
Method
Expected
Result
Check the circuit
The circuit
breakers.
breaker labels
are legible and
intact.
Check the UPS
The circuit
circuit breakers.
breaker labels
are legible and
intact.
Check the ATS
The panel
controller display
indicator is on.
panel.
The controller
display panel
displays
information
properly.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Maintenance
Troubleshooting
1. Clean the container using a
long-handled soft brush and
alkaline or neutral detergent.
2. Wash the container with clean
water.
For details, see the Paint Repair
section in the installation guide.
Troubleshooting
Reprint the labels.
Reprint the labels.
1. If the panel indicator is off,
verify that the power cable is
properly connected.
2. Replace the ATS by following
instructions in documents
delivered with the ATS.
1. If the information is not properly
displayed (fuzzy or blank),
verify that the power cable is
properly connected.
2. Replace the ATS by following
instructions in documents
delivered with the ATS.
30