Follow-up Procedure
Dispose of the removed ECC500 collector that is confirmed faulty.

5.3.12 Replacing an RH2288 V2 Server

Prerequisites
Impact on the System
The operation of the RH2288 V2 system or devices connected to the server may be
interrupted.
Preparations
Tools: Phillips screwdriver, small-sized flat-head screwdriver, ESD gloves, marker
Material: spare RH2288 V2 server
Documents required: documents delivered with the RH2288 V2 server, initial configuration
parameters for the management system, monitoring device layout diagram
Skill requirement: weak-current engineer
Procedure
Step 1 Press the power switch on the front panel of the RH2288 V2 server to power off the server,
and disconnect the power plug.
Step 2 Mark cables and ports on the RH2288 V2 server using a marker.
Step 3 Remove all cables connected to the RH2288 V2 server.
Step 4 Remove the RH2288 V2 server using a screwdriver and install a new RH2288 V2 server, as
shown in
Issue 01 (2016-01-10)
An RH2288 V2 server needs to be replaced.
A spare RH2288 V2 server of the same model is available and functional.
For the diagram and table, see the initial configuration guide.
Figure
5-27.