All-in-One Maintenance Guide
Step 4 (Optional) After the fault is rectified, replace by following instructions in
an Emergency Door Release
----End
Follow-up Procedure
Analyze the cause of the fault, and work out and record the preventive measures.

6.9 Emergency Operations for Container Door Open

Prerequisites
A door open alarm is generated for the IDS1000.
Procedure
Step 1 Locate the door based on the alarm information.
Step 2 Enter the container, verify that no device is lost and the system is working properly. Then
close the container door.
Step 3 Check whether the alarm is cleared.
----End
Follow-up Procedure
Analyze the cause of the fault, and work out and record the preventive measures.

6.10 Emergency Operations for an Early Fire Alarm

Prerequisites
The VESDA has generated a fire alarm.
Issue 01 (2016-01-10)
The access controller is faulty. Replace it by following instructions in
Controller.
If yes, no further action is required.
If no, go to
4.11 Door Status
The following early fire alarm emergency operations are for reference only.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Button.
Alarm.
6 Emergency Operations
5.3.13.7 Replacing an Access
5.3.13.5 Replacing
157

Advertisement

Table of Contents
loading

Table of Contents