Huawei IDS1000-A Maintenance Manual page 50

Air-cooled container data center
Table of Contents

Advertisement

IDS1000-A Air-Cooled Container Data Center
All-in-One Maintenance Guide
Categ
ory
Issue 01 (2016-01-10)
Item
Method
Circuit
Manual switch
breakers
off and on the
circuit breakers
five times.
Fastening
After the
bolts
equipment is
between
powered off,
power
perform the
cables
following
and the
steps:
busbar
Observe
whether the
cables
deteriorate
seriously.
Observe
whether the
cable
insulation
layers are in
good
condition.
Measure the
insulation
resistance of
cables.
Check
whether the
labels on
cables are
intact and
clear.
Check
whether the
fastening
bolts are
tightened.
UPS5000
Power cables
-E
and terminals
(between the
UPS and the
PDC).
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Expected
Troubleshooting
Result
The circuit
If a circuit breaker does not
breakers
operate smoothly, repair or
operate
replace the circuit breaker. For
smoothly.
details about how to replace a
circuit breaker, see the
replacement instructions for
the circuit breaker.
The cables
Replace a cable if it has
do not
deteriorated seriously and
deteriorate
its insulation has failed. For
and
more specific information,
insulation
contact Huawei technical
layers are in
support.
good
Tighten a bolt if it is loose.
condition.
Replace a label if it is
The cable
damaged or blurry. For
insulation
details connect Huawei
resistance is
technical support.
not less than
NOTE
5 megohm.
You are advised to perform this
The labels
operation only when the
are clear
All-in-one or power distribution
and intact.
equipment is powered off for
maintenance.
The
fastening
bolts are
tightened.
Cables and
Replace cables or secure output
terminals are
terminals.
free from
deterioration,
damage, spark
signs, and loose
contacts.