PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-
C2, ESC800-A1)
Installation Guide
Issue
02
Date
2021-09-28
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei PowerCube 1000

  • Page 1 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1- C2, ESC800-A1) Installation Guide Issue Date 2021-09-28 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide About This Document About This Document Purpose This document describes how to install the cabinet, boards, modules and cables, and provides installation checklists for reference. The figures provided in this document are for reference only.
  • Page 4 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide About This Document Symbol Description Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury.
  • Page 5: Table Of Contents

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide Contents Contents About This Document........................ ii 1 Safety Precautions........................1 1.1 General Safety..................................1 1.2 Personnel Requirements............................... 5 1.3 Electrical Safety..................................6 1.4 Installation Environment Requirements.......................... 7 1.5 Mechanical Safety................................... 9 1.6 Battery Safety..................................12 1.7 PV Module Safety.................................
  • Page 6 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide Contents 3.21 Water Sensor..................................55 3.22 ESM-48100A6..................................56 4 Installing PV Modules......................63 5 Installation Preparations..................... 64 5.1 Preparing Cables................................... 64 5.2 Preparing Tools..................................65 5.3 Installation Space Requirements............................. 66 5.4 Cabinet Cable Hole Positions and Definitions......................68 6 Cable Routing Requirements....................69...
  • Page 7 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide Contents 10.3 Installing Cables for the PVDU-150A1........................108 10.4 Installing CAN Communications Cables........................112 10.5 Installing Cables Between the ESC800 and the ICC800..................112 10.6 Installing Cables for a Reused DG..........................115 10.7 Installing DC Output Power Cables for the ETP48600-C5B1................117 10.8 Installing AC Input Power Cables for the ETP48600-C5B1................
  • Page 8 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide Contents B Acronyms and Abbreviations................... 151 Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 9: Safety Precautions

    The "NOTICE", "CAUTION", "WARNING", and "DANGER" statements in this document do not cover all the safety instructions. They are only supplements to the safety instructions. Huawei will not be liable for any consequence caused by the violation of general safety requirements or design, production, and usage safety standards.
  • Page 10 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions General Requirements ● Before installing, operating, or maintaining the equipment, remove any conductive objects such as watches or metal jewelry like bracelets, bangles, and rings to avoid electric shock.
  • Page 11 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions ● Before installing, operating, or maintaining a cabinet, clean up any water, ice, snow, or other sundries on the top of the cabinet to prevent sundries from falling into the cabinet when you open the cabinet door.
  • Page 12 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions Personal Safety ● If there is a probability of personal injury or equipment damage during operations on the equipment, immediately stop the operations, report the case to the supervisor, and take feasible protective measures.
  • Page 13: Personnel Requirements

    1.2 Personnel Requirements ● Personnel who plan to install or maintain Huawei equipment must receive thorough training, understand all necessary safety precautions, and be able to correctly perform all operations. ●...
  • Page 14: Electrical Safety

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions NO TE ● Professionals: personnel who are trained or experienced in equipment operations and are clear of the sources and degree of various potential hazards in equipment installation, operation, and maintenance ●...
  • Page 15: Installation Environment Requirements

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions ● Before connecting a power cable, check that the label on the power cable is correct. ● Before connecting the power supply, ensure that cable connections are correct.
  • Page 16 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions vents, or feeder windows of the equipment room. Ensure that no liquid enters the equipment to prevent faults or short circuits. ● Before installing the equipment into a cabinet, ensure that the cabinet is secured and will not tilt or fall down due to loss of balance, which can cause personal injury or equipment damage.
  • Page 17: Mechanical Safety

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions D ANGER ● Set a restricted area and eye-catching signs for working at heights to warn away irrelevant personnel. ● Carry the operation machinery and tools properly to prevent them from falling off and causing injuries.
  • Page 18 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions ● Do not drag steel ropes and hoisting tools or bump hoisted objects against hard objects during hoisting. Using Ladders ● Use wooden or fiberglass ladders when you need to perform live working at heights.
  • Page 19 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions When climbing a ladder, take the following precautions to reduce risks and ensure safety: ● Keep your body steady. ● Do not climb higher than the fourth rung of the ladder from the top.
  • Page 20: Battery Safety

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions ● Move or lift the equipment by holding its handles or lower edges. Do not hold the handles of modules (such as power supply units, fans, and boards) that are installed in the equipment because they cannot support the weight of the equipment.
  • Page 21 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions ● Dispose of waste batteries in accordance with local laws and regulations. Do not dispose of batteries as household waste. If a battery is disposed of improperly, it may explode.
  • Page 22 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions Flammable Gas NO TICE ● Do not use unsealed lead-acid batteries. ● To prevent fire or corrosion, ensure that flammable gas (such as hydrogen) is properly exhausted for lead-acid batteries.
  • Page 23: Pv Module Safety

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions ● Keep the lithium battery loop disconnected during installation and maintenance. ● When the ambient temperature is lower than the lower limit of the operating temperature (charge is forbidden at 0°C), do not charge the battery.
  • Page 24 ● The DG is used only for purposes specified by the manufacturer. When the DG is used for other purposes, obtain prior approval from Huawei even if the operation does not violate safety regulations. ● Ground the DG properly. Lock all electric control panels. Use insulated tools to check and repair energized devices.
  • Page 25 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions Transportation Precautions Before transportation: ● Survey the site and design a transportation scheme to ensure smooth transportation. ● Check that all required tools and lifting devices are available and functional.
  • Page 26 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 1 Safety Precautions ● For a DG in operation, its exposed pipes and components are at high temperatures. Avoid touching them to prevent burns. Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 27: Solution Scenarios

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 2 Solution Scenarios Solution Scenarios Table 2-1 Solutions scenarios Application Scenario Category Cabinet Configuration Component Configuration Solar-Diesel Hybrid Scenario (5 ICC800-A1-C2 ● PV Module Support kW DC load power) ● 445 W PV Module x 36 pcs ●...
  • Page 28: Component

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Component 3.1 PV Module Support PV module supports are available in four angles: 15°, 25°, 35°, and 45°. Figure 3-1 Standard A-shaped support 2.0 (low support) Issue 02 (2021-09-28)
  • Page 29: Pv Module (52240257)

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Figure 3-2 Standard A-shaped support 2.0 (high support) 3.2 445 W PV Module (52240257) Figure 3-3 PV module Table 3-1 PV module technical specifications Item Technical Specifications Maximum power...
  • Page 30: Sjb-0601A

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Item Technical Specifications Solar cell Monocrystalline silicon Dimensions 2095 mm x 1039 mm x 35 mm Weight About 24.5 kg Open-circuit voltage 49.0 V 3.3 SJB-0601A Figure 3-4 SJB-0601A exterior Issue 02 (2021-09-28) Copyright ©...
  • Page 31 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Figure 3-5 SJB-0601A interior (1) Input– (2) Output– (3) Ground screw (4) Input+ (5) Output+ Table 3-2 SJB-0601A technical specifications Item Specifications Dimensions (H x W x D) 220 mm x 158 mm x 65 mm Ports Six inputs converge into one output.
  • Page 32: Icc800-A1-C2

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component 3.4 ICC800-A1-C2 Figure 3-6 Exterior Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 33 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Figure 3-7 ICC800-A1-C2 interior (front view) (1) Smoke sensor (2) Light (3) DC air conditioner (4) Ground bar (5) Digital temperature and (6) Door status sensor humidity sensor (7) DC output box...
  • Page 34 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Figure 3-8 ICC800-A1-C2 interior (rear view) (1) DC air conditioner (2) Ground bar (3) Light (4) Door status sensor (5) DCDB48-650-13B (6) Space for equipment (7) Space for batteries...
  • Page 35 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Item Specifications Operating 0°C to +45°C (with solar radiation) temperature Transportation –40°C to +70°C temperature Storage temperature –40°C to +70°C Operating humidity 5%–95% RH (non-condensing) Altitude 0–4000 m. When the altitude ranges from 2000 m to 4000 m, the operating temperature decreases by 1°C for...
  • Page 36: Esc800-A1

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component 3.5 ESC800-A1 Figure 3-9 Exterior Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 37 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Figure 3-10 Interior (front view) (1) Smoke sensor (2) Light (3) DC air conditioner (4) Ground bar (5) Digital temperature and (6) Door status sensor humidity sensor (7) DC output box...
  • Page 38 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Figure 3-11 Interior (rear view) (1) Light (2) DC air conditioner (3) Ground bar (4) Door status sensor (5) Space for lithium batteries (6) DCDB48-650-13B Table 3-4 Cabinet specifications...
  • Page 39: Etp48600-C5B1

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Item Specifications Installation mode Floor-mounted Application environment Applicable to class C environments, but not to class D environments 3.6 ETP48600-C5B1 Figure 3-12 ETP48600-C5B1 interior (1) LLVD2 circuit breakers (2) Expansion circuit breakers...
  • Page 40 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Table 3-5 ETP48600-C5B1 technical specifications Item Technical Specifications Dimensions (W x D x H) 482.6 mm x 330 mm x 228 mm (including mounting ears) Weight ≤25 kg (excluding modules) DC output surge Differential mode: 10 kA (8/20 µs);...
  • Page 41: Dc Output Box

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Table 3-6 Intelligent circuit breaker (iCBD) Circuit Breaker Slot No. Feature The number indicated by the arrow is the slot The intelligent circuit breaker integrates the number of the circuit breaker. On the LUI, power-off and measurement functions.
  • Page 42: Lithium Battery Bus Bar Box Dcdb48-650-13B

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Figure 3-16 DC output box panel (ESC800-A1) (1) DC output circuit breakers (2) RTN+ terminal Table 3-8 PDU specifications Item DC output box DC power distribution DC output: 2 x 32 A/1P and 2 x 6 A/1P circuit...
  • Page 43: Junction Box For Lithium Batteries

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Item Specifications Dimensions (H x W x 43.6 mm x 482.6 mm x 255 mm Weight ≤ 5 kg Installation mode Installed in a 19-inch rack Cabling mode Routed in and out from the front...
  • Page 44: Ac Input Module Aiu03-100C

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component 3.10 AC Input Module AIU03-100C Figure 3-20 AIU03-100C exterior Table 3-11 AIU03-100C technical specifications Item Specifications Dimensions (W x D x H) 105 mm x 275 mm x 42 mm AC input Three phase input voltage range: 147–519 V AC...
  • Page 45 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component (7) RS485/RS232 port (8) Fast Ethernet (FE) port (9) CAN communications port (10) LCD Indicators Table 3-12 Indicator description Name Color Status Description Green The SMU is faulty or has no DC indicator input.
  • Page 46 After installing the specific WiFi module using the USB port, you can access the WebUI locally, which facilitates operations. NO TICE Using WiFi modules provided by another vendor may cause data loss or function exception. Consequences arising from this will not be borne by Huawei. Communications Ports Table 3-14 Communications port description Communications...
  • Page 47 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Communications Communications Communications Usage Port Parameter Protocol HTTPS protocol Connects to a PC and manages the SMU through the WebUI. TCP-Modbus Adapts to protocol Huawei TCP- Modbus protocol and...
  • Page 48 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Signal Description 4/5/7/8 Table 3-16 Pin definitions for the RS485/RS232 port Signal Description Transmits data over RS485 Receives data over RS485 RX232 Receives data over RS232 TX232 Transmits data over RS232...
  • Page 49: User Interface Module Uim05D1

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component 3.12 User Interface Module UIM05D1 Figure 3-23 Panel (1) Dry contacts and sensor (2) COM communications port (3) Battery temperature sensor ports port (4) Door status sensor port (5) Button (reserved)
  • Page 50: Dg Expansion Module Gim

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Signal Description RS485_TX+ RS485 data, positive RS485_TX- RS485 data, negative Grounding Grounding 3.13 DG Expansion Module GIM Figure 3-26 GIM (1) SIM card slot 1 (2) SIM card slot 2...
  • Page 51 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Indicators Figure 3-27 GIM indicators Table 3-20 Indicator description Indicator Color Status Description Running Green The module is faulty or has no DC indicator input. (RUN) Blinking slowly (0.5...
  • Page 52 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Ports Figure 3-28 GIM ports Table 3-21 Port description Port Type Silk Screen Description Remarks 1 and 8 DG control port DO normally closed Control DG startup port and shutdown.
  • Page 53: Psu

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component 3.14 PSU Figure 3-29 PSU (1) Power indicator (2) Alarm indicator (3) Fault indicator (4) Locking latch (5) Handle Function ● Converts AC power into 48 V DC power.
  • Page 54 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Indicators Table 3-23 PSU indicator description Indicator Color Status Description Power Green Steady on The PSU has an AC input. indicator The PSU has no AC input. The PSU is faulty.
  • Page 55: Ssu

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component 3.15 SSU Figure 3-30 SSU (1) Power indicator (2) Alarm indicator (3) Fault indicator (4) PV positive input port (5) PV negative input port (6) Air intake vent (7) Handle...
  • Page 56: Power Module M48500N1

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Indicators Table 3-25 SSU indicator description Indicator Color Status Description Power Green Steady The SSU has a DC power input. indicator There is no DC input. The input fuse is damaged.
  • Page 57 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Figure 3-31 M48500N1 exterior (1) Power indicator (2) Alarm indicator (3) Fault indicator (4) Two 12 V DC outputs (5) Two 24 V DC outputs (6) Handle (7) ON/OFF switch (used to...
  • Page 58 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Item Color Status Description Alarm Yellow Steady on ● An ambient overtemperature alarm is indicator generated. ● Overtemperature protection is triggered. ● Undertemperature protection is triggered. ● The 12 V DC, 24 V DC, or 24 V AC output is turned off.
  • Page 59: Pvdu-150A1

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Item Specifications Maximum input current 16.3 A (Rated value: 12.5 A) Output voltage DC output voltage range: 12–13.2 V DC DC output voltage range: 24–28.2 V DC AC output voltage range: 24–26.4 V AC (rated...
  • Page 60: Antenna

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Table 3-28 PVDU-150A1 technical specifications Item Specifications Dimensions (H x W x 43.6 mm x 482.6 mm x 330 mm (including mounting ears) Weight ≤ 3.0 kg Input 60–150 V DC; 2 x 58 A max.
  • Page 61: Digital Temperature And Humidity Sensor

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Item 4G Antenna Storage temperature –40°C to +85°C, typical value 25°C Relative humidity 0%–95% RH (non-condensing), typical value: 50% Altitude 0–4000 m (When the altitude ranges from 0 m to 4000 m, the operating temperature decreases by 1°C for...
  • Page 62 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component DIP Switch The following figure shows the DIP switch on a digital T/H sensor. The following table describes the DIP switch settings. Figure 3-37 DIP switch 1 Figure 3-38 DIP switch 2...
  • Page 63: Smoke Sensor

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component 3.20 Smoke Sensor Figure 3-39 Appearance 1 (1) Wiring port (2) Base (3) Indicator Figure 3-40 Appearance 2 (1) Wiring port (2) Base (3) Indicator 3.21 Water Sensor A water sensor detects water based on the resistance change between both electrodes.
  • Page 64: Esm-48100A6

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Figure 3-41 Appearance 3.22 ESM-48100A6 Figure 3-42 Panel and ports Table 3-31 Port description Silk Screen Item Protective ground Alarm output dry contacts Running indicator Alarm indicator Charge indicator...
  • Page 65 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Silk Screen Item Buzzer (The ESM supports the buzzer alarm function. After the buzzer alarm function is enabled, the buzzer buzzes when the ESMU detects that the ESM is stolen through the software lock, intelligent displacement lock, or IoT module.)
  • Page 66 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Table 3-33 LED indicator description Indicator Silk Item Color Description Screen Running Green Steady on: Communication is normal indicator (including board startup, self-check, software loading, and board power-on when not loaded; excluding sleep when the input/output port or activation port is energized).
  • Page 67 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Indicator Silk Item Color Description Screen Green 1. 0–24% SOC indicators ● 25% indicator: blinking ● Other SOC indicators: off 2. 25%–49% SOC ● 25% indicator: steady on ● 50% indicator: blinking ●...
  • Page 68 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Table 3-34 Communications port pins Pin Definition RJ45 Pin Signal Definition Description RS485 T+ RS485 ● Four-wire RS485 transmission communications, complying with the Modbus protocol RS485 T- RS485 ● Support the baud transmission rate of 9600 bit/s.
  • Page 69 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component NO TE ● Sleep mode: The BMS is in sleep mode before it is activated. The BMS can enter the offline mode only after it is activated. If the BMS enters the sleep mode after you press the MANUAL ON/OFF button, the DSP keeps working as long as the power port or PWR port receives effective input voltage.
  • Page 70 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 3 Component Item Specifications Ripple and noise ≤ 200 mV IP rating IP40 Other requirements Indoor scenario: ● There should be no conductive dust, corrosive gas, or explosion hazard. ● Dust, corrosive substances, pests, molds, and other indicators should be controlled in accordance with Class 3.1 requirements in...
  • Page 71: Installing Pv Modules

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 4 Installing PV Modules Installing PV Modules For details about how to install PV module supports and cables, see the related documents available at https://support.huawei.com. Table 4-1 References for PV modules...
  • Page 72: Installation Preparations

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 5 Installation Preparations Installation Preparations 5.1 Preparing Cables All cables must comply with local laws, regulations, and standards as well as customer requirements. The cross-sectional area of a power cable depends on the current that will flow through the cable and the voltage drop allowed for the cable.
  • Page 73: Preparing Tools

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 5 Installation Preparations 5.2 Preparing Tools NO TICE Use tools with insulated handles. The following figures are for reference only. Table 5-2 Installation tools and instruments Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 74: Installation Space Requirements

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 5 Installation Preparations 5.3 Installation Space Requirements NO TE The power cabinet and battery cabinet have the same installation dimensions. The following figure uses the power cabinet ICC800-A1-C2 as an example.
  • Page 75 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 5 Installation Preparations Figure 5-2 Installation dimensions for combined cabinets Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 76: Cabinet Cable Hole Positions And Definitions

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 5 Installation Preparations 5.4 Cabinet Cable Hole Positions and Definitions Figure 5-3 Positions and definitions of cable holes at the bottom of the cabinet (1) For AC power cables and (2) For DC power cables...
  • Page 77: Cable Routing Requirements

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 6 Cable Routing Requirements Cable Routing Requirements Lay out cables according to the following requirements to avoid signal interference. NO TE If some of the cables described below do not need to be installed onsite, ignore the requirements for routing such cables.
  • Page 78 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 6 Cable Routing Requirements Indoor Cable Routing Requirements ● Cables are routed indoors through feeder windows. ● Trap the cable part outside a feeder window according to requirements for the minimum bending radius.
  • Page 79 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 6 Cable Routing Requirements ● All conductive metal components inside the enclosure should properly connect to protection ground terminals. Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 80: Installing The Cabinet

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 7 Installing the Cabinet Installing the Cabinet 7.1 Marking Mounting Holes Prerequisites ● The installation environment is clean and dry. ● The concrete floor on which a cabinet is to be installed is level.
  • Page 81: Drilling Holes And Installing Expansion Sleeves

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 7 Installing the Cabinet Figure 7-2 Marking mounting holes for two cabinets ----End 7.2 Drilling Holes and Installing Expansion Sleeves Procedure Step 1 Remove the cabinet pallet and take out the flat washer.
  • Page 82: Hoisting A Cabinet

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 7 Installing the Cabinet Figure 7-4 Replacing the flat washer Step 3 Drill a hole into the concrete floor using a hammer drill. The hole depth should range from 50 mm to 55 mm.
  • Page 83 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 7 Installing the Cabinet Figure 7-6 Removing the sealing nuts Step 2 Install lifting eyes. NO TE The tool used for installing lifting eyes should be an iron bar with a diameter no more than 20 mm.
  • Page 84 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 7 Installing the Cabinet Figure 7-8 Hoisting a cabinet Step 4 After hoisting is complete, remove the lifting eyes and reinstall the sealing nuts. Figure 7-9 Installing the sealing nuts ----End Issue 02 (2021-09-28) Copyright ©...
  • Page 85: Installing Cabinets On A Concrete Floor

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 7 Installing the Cabinet 7.4 Installing Cabinets on a Concrete Floor Procedure Step 1 Place the cabinet onto the concrete floor and align the mounting holes in the cabinet with those in the concrete floor.
  • Page 86: Combining Cabinets

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 7 Installing the Cabinet Figure 7-11 Installing left and right sealing plates ----End 7.6 Combining Cabinets 7.6.1 Removing sealing plates Procedure Step 1 Remove the sealing plates from the side that needs to combine cabinets.
  • Page 87: Securing Cabinets

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 7 Installing the Cabinet Figure 7-12 Removing sealing plates ----End 7.6.2 Securing Cabinets Procedure Step 1 Install distance blocks. Figure 7-13 Installing distance blocks (1) Distance blocks Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 88: Installing Connecting Kits

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 7 Installing the Cabinet Step 2 Move the cabinet to the corresponding mounting holes. Step 3 Place flat washers, spring washers, and expansion bolts into the cabinet mounting holes. Step 4 Tighten the expansion bolts to secure the cabinet.
  • Page 89 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 7 Installing the Cabinet Figure 7-15 Installing silicone rubber waterproof connectors Step 2 Secure the silicone rubber waterproof connectors to the cabinets. Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 90: Installing A Top Sealing Plate

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 7 Installing the Cabinet Figure 7-16 Securing silicone rubber waterproof connectors ----End 7.6.4 Installing a Top Sealing Plate Procedure Step 1 Assemble the top sealing plates for the combined cabinets. Issue 02 (2021-09-28)
  • Page 91 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 7 Installing the Cabinet Figure 7-17 Assembling top sealing plate Step 2 Remove the screws on the top of the combined cabinets. Figure 7-18 Removing screws Step 3 Install the waterproof rubber rings for the combined cabinets.
  • Page 92: Installing A Ground Cable

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 7 Installing the Cabinet Figure 7-19 Installing waterproof rubber rings Step 4 Install the top sealing plate for the combined cabinets. Figure 7-20 Installing top sealing plate ----End 7.7 Installing a Ground Cable Procedure Step 1 Install a cabinet ground cable.
  • Page 93 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 7 Installing the Cabinet Figure 7-21 Installing a cabinet ground cable (1) Site ground bar NO TE If a DG is deployed, connect the DG, ICC cabinet, and battery cabinet to the same site ground bar.
  • Page 94: Installing Components

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 8 Installing Components Installing Components 8.1 Component Installation Positions Figure 8-1 Component installation positions in ICC800 (5 KW) Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 95 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 8 Installing Components Figure 8-2 Component installation positions in ICC800 (8 KW) Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 96: Installing A Psu

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 8 Installing Components Figure 8-3 Component installation positions in ESC800 (8 KW) 8.2 Installing a PSU Prerequisites ● If a PSU is required, perform the following steps to install it. ●...
  • Page 97: Installing A Power Module M48500N1

    ● Install rectifiers from left to right and from top to bottom according to the phase layout in the module installation space. ● If the PSU is damaged, contact your local Huawei office. ● To avoid electric shock, do not put your hands into a PSU slot.
  • Page 98: Installing A Dg Expansion Module

    The filler panel has been removed from the slot. NO TICE ● If the M48500N1 is damaged, contact the local Huawei office. ● To avoid electric shock, do not put your hands into a module slot. ● When an M48500N1 is running, high temperature is generated around the air exhaust vent at the rear.
  • Page 99: Installing An Ac Input Module

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 8 Installing Components NO TICE This step is required if the DG expansion board is used for 4G wireless networking. The SIM card inserted into the DG expansion module should support GSM, WCDMA, TD-SCDMA, TDD, and FDD standards, and have the SMS and data service functions enabled.
  • Page 100: Installing A Pvdu-150A1

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 8 Installing Components Figure 8-8 Installing an AC input module ----End 8.6 Installing a PVDU-150A1 Context If a PVDU is required, perform the following steps to install it. Procedure Step 1 Install the PVDU in a 19-inch rack.
  • Page 101: Installing An Ssu

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 8 Installing Components Figure 8-10 Installing a PVDU-150A1 ground cable (1) Cabinet ground bar or ground screws on the rack ----End 8.7 Installing an SSU Prerequisites NO TICE ● If an SSU is required, perform the following steps to install it.
  • Page 102: Installing A Digital Temperature And Humidity Sensor

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 8 Installing Components 8.8 Installing a Digital Temperature and Humidity Sensor Procedure Step 1 Install a digital temperature and humidity sensor on the side panel of the cabinet. Figure 8-12 Installing a digital temperature and humidity sensor...
  • Page 103 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 8 Installing Components Figure 8-13 Installing a digital temperature and humidity sensor cable ----End Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 104: Installing Batteries And Cables

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 9 Installing Batteries and Cables Installing Batteries and Cables Prerequisites Ensure that batteries are from the same manufacturer, of the same model, and in the same batch. Do not mix old and new batteries together.
  • Page 105: Installing Lithium Batteries

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 9 Installing Batteries and Cables 9.1 Installing Lithium Batteries Prerequisites NO TICE ● Before installing lithium batteries, ensure that the cabinet anchor bolts are tightened. ● Install lithium batteries at the lower layer and then the upper layer.
  • Page 106: Installing Battery Cables

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 9 Installing Batteries and Cables Figure 9-2 Installing the ESM ground cable ----End 9.2 Installing Battery Cables 5 KW Scenario Step 1 Install the battery power cables. NO TICE Install the negative power cables for batteries and then the positive ones.
  • Page 107 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 9 Installing Batteries and Cables Figure 9-3 Installing power cables (battery 1-6) Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 108 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 9 Installing Batteries and Cables Figure 9-4 Installing power cables (battery 7-16) ----End 8 KW Scenario Step 1 Install the battery power cables. NO TICE Install the negative power cables for batteries and then the positive ones.
  • Page 109 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 9 Installing Batteries and Cables Figure 9-5 Installing power cables in ICC800 (battery 1) Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 110 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 9 Installing Batteries and Cables Figure 9-6 Installing power cables in ICC800 (battery 2-7) NO TE Cable connections for batteries in the front and rear doors of the ESC800 are the same. The following uses cable connections for batteries in the front door as an example.
  • Page 111: Installing Battery Cables Between The Battery Cabinet And The Icc Cabinet

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 9 Installing Batteries and Cables Figure 9-7 Installing power cables in ESC800 ----End 9.3 Installing Battery Cables Between the Battery Cabinet and the ICC Cabinet Procedure Step 1 Install battery cables between the battery cabinet and the ICC cabinet.
  • Page 112 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 9 Installing Batteries and Cables Figure 9-8 Installing battery cables between the battery cabinet and the ICC cabinet (1) ETP48600-C5B1 (2) Junction box in the ESC800 Step 2 Cover a PVC corrugated pipe over the cable parts outside the cabinet and secure the PVC corrugated pipe to the cable hole.
  • Page 113: Installing Cables

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 10 Installing Cables Installing Cables D ANGER ● Ensure that the upstream AC input circuit breaker is OFF, and attach labels such as "No operations allowed." ● Before installing cables, switch all the circuit breakers to OFF, and remove the fuses from positions where cables will be installed.
  • Page 114: Optional) Installing Communications Cable

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 10 Installing Cables 10.2 (Optional) Installing Communications Cable 10.2.1 IP Networking Procedure Step 1 Connect the FE port on the site monitoring unit (SMU) by using a network cable. Figure 10-2 Connecting a communications cable (for WebUI management)
  • Page 115: Bbu In-Band Networking

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 10 Installing Cables Figure 10-3 Installing an antenna NO TICE Before installing the antenna, remove the plastic shell from the antenna base to ensure magnetic adherence. ----End 10.2.3 BBU In-band Networking...
  • Page 116: Installing Cables For The Pvdu-150A1

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 10 Installing Cables Figure 10-4 Installing a communications cable (1) RS232/RS485 port on the SMU (2) MON1 port on the BBU ----End 10.3 Installing Cables for the PVDU-150A1 Prerequisites D ANGER Switch off all load circuit breakers before installing the power cables.
  • Page 117 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 10 Installing Cables NO TE A PVDU-150A1 can connect to a maximum of two SJBs. Install cables based on the actual number of SJBs. Reinstall the protective cover for the DC input circuit breakers on the PVDU.
  • Page 118 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 10 Installing Cables Figure 10-7 Connecting cables between the PVDU-150A1 and the ETP48600-C5B1 (8 KW) Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 119 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 10 Installing Cables Figure 10-8 Connecting cables between the PVDU-150A1 and the DCDB (8 KW) Step 3 Connect power cables between the SSU and the PVDU. NO TICE Install cables between the PVDU and the SSUs with correct polarity.
  • Page 120: Installing Can Communications Cables

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 10 Installing Cables 10.4 Installing CAN Communications Cables NO TICE A build-out resistor needs to be installed for the ESM at the last level of CAN communication. Figure 10-10 Installing CAN communications cables (1) Build-out resistor 10.5 Installing Cables Between the ESC800 and the...
  • Page 121 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 10 Installing Cables Figure 10-11 Installing cascading cables NO TE If multiple digital temperature and humidity sensors are cascaded, you need to set the DIP switch. Table 10-1 DIP switch settings...
  • Page 122 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 10 Installing Cables Figure 10-12 Installing cascading cables Step 3 Install cables between the ETP48600-C5B1 and the DC output box. Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 123: Installing Cables For A Reused Dg

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 10 Installing Cables Figure 10-13 Installing cables between the ETP48600-C5B1 and the DC output box. (1) ETP48600-C5B1 (2) DC output box in the ESC800 ----End 10.6 Installing Cables for a Reused DG...
  • Page 124 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 10 Installing Cables Procedure Step 1 Connect one end of the DG startup, shutdown, and resetting signal cables to the DG 1 startup, shutdown, and resetting ports on the GIM respectively.
  • Page 125: Installing Dc Output Power Cables For The Etp48600-C5B1

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 10 Installing Cables 10.7 Installing DC Output Power Cables for the ETP48600-C5B1 Prerequisites D ANGER Switch off all load circuit breakers before installing the power cables. Procedure Step 1 Install DC output power cables.
  • Page 126: Installing Ac Input Power Cables For The Etp48600-C5B1

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 10 Installing Cables 10.8 Installing AC Input Power Cables for the ETP48600-C5B1 Prerequisites D ANGER ● Ensure that the upstream AC input circuit breakers are OFF, and attach warning labels such as "Do not operate."...
  • Page 127: Installation Verification

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 11 Installation Verification Installation Verification After installing the cabinet and all equipment, check the installation items, installation environment, and cables. Checking the Cabinet Installation Table 11-1 Cabinet installation checklist Check That...
  • Page 128 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 11 Installation Verification Checking Electrical Connections Table 11-3 Electrical connection checklist Check That Result All the ground cables prepared onsite contain □ Yes □ No copper core wires and have correct diameters. No switches or fuses are installed on the cables and no short-circuit occurs.
  • Page 129: Power-On And Commissioning

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Power-on and Commissioning 12.1 Connecting the Reused DG Supply Prerequisites D ANGER Sparks, flames, and inflammable objects must not be close to a DG because this may cause fire or explosions.
  • Page 130: Setting Parameters

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Item Expected Result Battery voltage The battery voltage is greater than 12 V DC. Procedure Step 1 Check that all DG switches and circuit breakers are OFF.
  • Page 131: Setting The Date And Time

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Item Settings Date and Time Set this parameter to the local date and time. Battery Vendor AGISSON Battery Model ESM-A The SMU may restart. 12.2.3 Setting the Date and Time NO TE ●...
  • Page 132: Setting The Capacity Of A Circuit Breaker

    Set when a DC power distribution unit (such as iDMU48-300B-17A) that supports the measurement function is added. – Set when Huawei solar PV distribution units (such as the PVDU-100A1, PVDU-150A1, PVDU-150A3, and PVDU-200A1) are connected in the solar access scenario.
  • Page 133: Setting The Branch User And Load Type

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Table 12-5 Setting basic branch parameters on the LCD Main Menu Second Third-Level Fourth-Level Fifth-Level Default Value Range -Level Menu Menu Menu Value Menu Parameters Digital DC Output...
  • Page 134 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning ● Time mode: When an AC power failure occurs, you can perform disconnection management based on the power failure duration. ● High-temperature power-off mode: You can perform disconnection management based on the ambient temperature (reported by the ambient temperature sensor).
  • Page 135: Setting The Pvdu Power Cascading Port Parameters

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Main Menu Second Third-Level Fourth- Fifth-Level Setting Value Range -Level Menu Level Menu Menu Menu PD Duration 0 min 0–1440 Exempt Period Disable Disable/Enable No Bk Exempt Start...
  • Page 136: Setting 57 V Constant Voltage Output Parameters

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning ----End 12.2.7 Setting 57 V Constant Voltage Output Parameters NO TE This parameter is set only in the lithium battery–only scenario. Table 12-10 Setting 57 V constant voltage output parameters...
  • Page 137 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Table 12-12 Setting parameters for the reused DG Main Menu Second-Level Third-Level Fourth-Level Default Setting Menu Menu Menu Value Parameters Genset Genset 1 Rated Power 12.5 kW...
  • Page 138 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Main Menu Second-Level Third-Level Fourth-Level Default Setting Menu Menu Menu Value Output Mode 3-Phase 4- Set this Wire parameter as required. Rated Phase 230 V Set this...
  • Page 139 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Main Menu Second-Level Third-Level Fourth-Level Default Setting Menu Menu Menu Value Tank Length 1.50m Set the parameters NOTE based on the This length, height. parameter is displayed only...
  • Page 140: Setting Sensor Parameters

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Main Menu Second-Level Third-Level Fourth-Level Default Setting Menu Menu Menu Value Abnor Change 3.0 cm 3.0 cm Thres Abnor Change 10.0min 10.0min Level Filter 30min 30min Time...
  • Page 141: Setting Multiplexed Dry Contact Ports Type

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning 12.2.11 Setting Multiplexed Dry Contact Ports Type Context ALMn/DINn on the silk screen of the UIM indicates that they are multiplexed ports. By default, they are ALM output ports. You can set the multiplexed port to a DIN input dry contact or an ALM output dry contact as required.
  • Page 142: Setting Communications Parameters

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Table 12-18 Setting alarm conditions for dry contact outputs Main Menu Second-Level Third-Level Default Value Setting Menu Menu Parameters Alarm DO Dry Contact ALM1 Alarm Close, Open...
  • Page 143 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Main Menu Second-Level Third-Level Fourth-Level Default Setting Menu Menu Menu Value Default 192.168.0.1 Set this parameter Gateway according to the address information provided by the network administrator.
  • Page 144 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Main Menu Second-Level Third-Level Fourth-Level Default Setting Menu Menu Menu Value SIMn Acc A maximum of 28 Point Name characters. Lowercase letters NOTE (a–z), uppercase This parameter is displayed letters (A–Z), digits...
  • Page 145: Optional) Setting Communications Addresses For Air Conditioners

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Table 12-23 Setting NetEco parameters Main Second-Level Third-Level Fourth-Level Default Setting Menu Menu Menu Menu Value Parameters Comm. Network NetEco 192.168.0.10 Set this parameter Settings Parameters Parameters...
  • Page 146 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Figure 12-1 Air conditioner display panel Step 1 Press ENTER on the home screen of the air conditioner display panel to access the password input screen. Step 2 Enter the password 0001 and press ENTER to access the main menu screen.
  • Page 147: Starting The Dg Self-Check

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Figure 12-2 Air conditioner display panel Step 1 On the main menu screen, press and hold Prg/mute for 3 seconds to set parameters. Step 2 Select F07 and press Set. Set the air conditioner address by pressing the up or down button, and then press Set.
  • Page 148: Connecting The Pv Supply

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning Table 12-27 Starting the DG self-check Main Menu Second-Level Third-Level Fourth-Level Setting Menu Menu Menu Running Control Genset Genset Self Confirm Self Check Check NO TE Self-check process: 1.
  • Page 149: Connecting The Lithium Battery Supply

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 12 Power-on and Commissioning 12.5 Connecting the Lithium Battery Supply Procedure Step 1 Switch on the lithium battery circuit breaker. Step 2 Check whether the lithium batteries communicate properly. If the run indicator on a lithium battery is steady on, the battery communicates properly with the monitoring device.
  • Page 150: Checking Before Leaving The Site

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 13 Checking Before Leaving the Site Checking Before Leaving the Site 13.1 (Optional) Installing Front and Rear Sealing Plates Procedure Step 1 Install sealing plates on the front and rear of the ICC800/ESC800 base.
  • Page 151: Installing Front And Rear Sealing Plates For Combined Cabinets

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 13 Checking Before Leaving the Site 13.2 Installing Front and Rear Sealing Plates for Combined Cabinets Procedure Step 1 Assemble the front and rear sealing plates for the combined cabinets. Figure 13-2 Assembling front and rear sealing plates Step 2 Install the front and rear sealing plates for the combined cabinets.
  • Page 152: Subsequent Operations

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 13 Checking Before Leaving the Site Figure 13-3 Installing front and rear sealing plates ----End 13.3 Subsequent Operations Procedure Step 1 Set all the switches to the appropriate status based on site requirements.
  • Page 153 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide 13 Checking Before Leaving the Site Step 7 Ensure that the site is clean before you leave the site. ----End Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd.
  • Page 154: A Appendix

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide A Appendix Appendix A.1 Operating Environment Environments subject to atmospheric corrosion can be classified into four categories: Table A-1 Application environment description Category Environment Definition Class A Controlled environment. Indoor environment where the ambient temperature and humidity are controlled (including rooms where people live) and the relative humidity of air is controlled below 65%.
  • Page 155: Associations Between Uim Dry Contacts And Alarms

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide A Appendix A.2 Associations Between UIM Dry Contacts and Alarms NO TE ● The DIN1/ALM1, DIN2/ALM2, DIN3/ALM3, DIN5/ALM4, and DIN6/ALM5 are multiplexed ports. By default, they are ALM output ports. ● You can set the DIN1/ALM1, DIN2/ALM2, DIN3/ALM3, DIN5/ALM4, and DIN6/ALM5 to an input dry contact or an output dry contact as required.
  • Page 156: Preparing Terminals

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide A Appendix Port Type Silk Screen Associated Alarm ALM7 Door status alarm (including the power cabinet, battery cabinet, and equipment cabinet) ALM8 Power cabinet temperature control Fan 1 fault, fan 2 fault, fan 3 fault, high...
  • Page 157: Installing Floating Nuts

    PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide A Appendix Preparing an OT Terminal Figure A-2 Preparing an OT terminal (1) Cable (2) OT terminal (3) Heat shrink tubing (4) Hydraulic pliers (5) Heat gun A.4 Installing Floating Nuts This section describes the positions and procedures for installing floating nuts for components of different heights.
  • Page 158 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide A Appendix Figure A-5 Positions for installing floating nuts for a 3 U module Figure A-6 Positions for installing floating nuts for a 4 U module Step 2 Install floating nuts using a flat-head screwdriver.
  • Page 159 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide B Acronyms and Abbreviations Acronyms and Abbreviations baseband unit control area network dry contact input dry contact output diesel generator energy storage cabinet electrostatic discharge energy storage module fast Ethernet HTTPS...
  • Page 160 PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2, ESC800-A1) Installation Guide B Acronyms and Abbreviations liquid crystal display LLVD load low voltage disconnection NetEco Network Ecosystem power supply unit subscriber identity module site monitoring unit solar supply unit user interface module Issue 02 (2021-09-28)