Figure 5-50 Position of the cable to the solenoid valve
Step 4 Disconnect the cable to the pneumatic switch, as shown in
Figure 5-51 Position of the cable to the pneumatic switch
Step 5 Remove the high-pressure hose and adapter of the fire cylinder using an adjustable wrench, as
shown by 1 and 2 in