IDS1000-A Air-Cooled Container Data Center
All-in-One Maintenance Guide
Procedure
Step 1 Shut down the GSM modem, and unplug the power cable.
Step 2 Remove the GSM modem serial cable from the serial port of the RH2288 V2 server.
Step 3 Remove the GSM modem antenna.
Step 4 Remove the faulty GSM modem using a screwdriver.
Step 5 Remove the SIM card from the faulty GSM modem and insert it in the new GSM modem.
1.
2.
Step 6 Connect the serial port of the GSM modem to that of the RH2288 V2 server.
Step 7 Reinstall the GSM modem antenna, and bind the antenna to the cable trough using cable ties,
as shown in
Issue 01 (2016-01-10)
For the diagram and table, see the initial configuration guide.
Remove the screws on the SIM card slot of the faulty GSM modem using a small-sized
flat-head screwdriver, and removing the SIM card, as shown in
Figure 5-18 Removing the SIM card
Remove screws from the SIM card slot of the new GSM modem, insert the SIM card
into the new GSM modem, and tighten the screws.
Figure
5-19.