IDS1000-A Air-Cooled Container Data Center
All-in-One Maintenance Guide
Procedure
Step 1 Power off the fire control panel.
Step 2 Open the fire control panel and record the cable connections and labels.
Figure 5-62 Fire control panel
Step 3 Remove cables and the faulty fire control panel, remove the batteries from the faulty fire
control panel, install the new fire control panel, and reconnect cables.
Step 4 Install parallel cables for fire control panel batteries, as shown in
Figure 5-63 Connecting battery cables
Step 5 Power on the fire control panel.
Step 6 Check whether the new fire control panel is working properly.
----End
Follow-up Procedure
Dispose of the removed fire control panel that is confirmed faulty.
Issue 01 (2016-01-10)
If the power indicator is on and the alarm indicator is off, the fire control panel is working properly.