Do not impact or strike the fire cylinder during transportation or installation.
Assign sufficient people for transportation and installation if no auxiliary tool is available.
Step 2 Disconnect the cables between the solenoid valve and the fire control panel, as shown in
Figure
Figure 5-49 Position of the interconnection cable
Step 3 Disconnect cables shown in
Issue 01 (2016-01-10)
5-49.
Figure 5-50
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
and remove the solenoid valve.