Preparations
Tools: adjustable wrench, utility knife, flat-head screwdriver, protective gloves
Materials: dry rag, sucker, rubber plug, thermal insulation foam, spare condensate drainpipe
Documents required: container layout diagram
Skill requirement: cooling engineer
Procedure
Step 1 (Optional) Open the aisle floor where a condensate drainpipe needs to be replaced.
Step 2 Remove the water inside the cylinder using suckers and vessels.
Step 3 Remove all fasteners and the thermal insulation foam from the condensate water pipe.
Step 4 Remove the condensate drainpipe from the precision air conditioner, and block the condensate
drainage port using a rubber plug.
Step 5 Remove the other end of the condensate drainpipe.
Step 6 Take out the rubber plug and install a new condensate drainpipe.
Step 7 Check that the new condensate drainpipe is working properly.
Step 8 Dry the drainpipe using the dry rag, and wrap the thermal insulation foam.
Step 9 (Optional) Reinstall the aisle floor.
----End
Follow-up Procedure
Dispose of the removed condensate drainpipe that is confirmed faulty.
Issue 01 (2016-01-10)
For the diagram, see the quick installation guide.
Wipe off the water with a dry cloth if there is not much water.
Hold the removed drainpipe properly to prevent residual water from flowing out into the container.
If there is no water in the condensate water pan, the condensate drainpipe is working properly.