Refitting The Base - ABB IRB 2600 Series Product Manual

Hide thumbs Also See for IRB 2600 Series:
Table of Contents

Advertisement

4 Repair
4.6.2 Replacing the base
Continued

Refitting the base

Use this procedure to refit the complete arm system to the base.
1
2
3
4
Continues on next page
296
Action
CAUTION
The weight of the base is 49 kg
All lifting accessories used must be sized
accordingly.
Fit three lifting eyes to the base and secure
with roundslings in an overhead crane or
similar.
Fit the new base to the support legs and
secure with the attachment screws.
Valid for IRB 2600-20/1.65, IRB 2600-
12/1.65, IRB 2600-12/1.85, IRB 2600ID-
15/1.85, IRB 2600ID-8/2.0:
Remove residues of old Loctite and other
contaminations from surfaces before apply-
ing new Loctite 574.
© Copyright 2009-2018 ABB. All rights reserved.
Note
Valid for IRB 2600-20/1.65, IRB 2600-
12/1.65, IRB 2600-12/1.85, IRB 2600ID-
15/1.85, IRB 2600ID-8/2.0:
Lifting eye: M8
Valid for IRB 2600 Type C-20/1.65, IRB
2600 Type C-12/1.65:
Lifting eye: M12
xx1800000885
Tip
Use Loctite 7063 (or similar) for cleaning.
Product manual - IRB 2600
3HAC035504-001 Revision: Q

Advertisement

Table of Contents
loading

Table of Contents