Toyota Land Cruiser 1988 Repair Manual page 75

Table of Contents

Advertisement

EM-44
ENGINE MECHANICAL- Timing Gears and Camshaft
EM4368
8.
INSTALL PUSH ROD COVER
Install a new gasket and the push rod cover with the ten
bolts and two nuts.
Torque: 40 kg-em (35 in.-lb, 3.9 N·m)
9.
INSTALL VALVE ROCKER SHAFT ASSEMBLY
(See steps 2 to 4 on pages EM-28, 29)
10. INSTALL DISTRIBUTOR (See page IG-10)
11. INSTALL WATER PUMP PULLEY AND FLUID
COUPLING WITH FAN (See page C0-7}
12. INSTALL PS IDLER PULLEY AND BRACKET
ASSEMBLY
13. INSTALL PS AND AIC COMPRESSOR BRACKETS
14. INSTALL PS PUMP AND A/C COMPRESSOR
(See steps 19 and 20 on page EM-31)
15. INSTALL AIR INTAKE HOSE, AIR FLOW METER
AND AIR CLEANER ASSEMBLY
(a) Install the air intake hose, air flow meter and air
cleaner cap with the wing nut and three clips.
(b) Connect following hoses:
• ISC hose
• Air pump hose
• Distributor hose
• PCV hose
• Three hoses from the intake chamber rear side
• Two hoses from the VCV of the charcoal canister
16. CONNECT ACCELERATOR AND THROTTLE
CABLES. AND ADJUST THEM
17. FILL WITH ENGINE COOLANT (See page C0-3)
18. CONNECT CABLE TO NEGATIVE TERMINAL OF
BATTERY
19. START ENGINE AND CHECK FOR LEAKS
20. PERFORM ENGINE ADJUSTMENT
(a) Adjust the ignition timing.
{See steps 10 to 14 on page IG-11)
Ignition timing: 7° BTDC @ idle
(w
I Terminals TE1 and E1
short-circuited)
{b) Adjust the valve clearance. (See page EM-7)
Valve clearance (Hot}:
Intake
0.20 mm (0.008 in.)
Exhaust 0.35 mm (0.014 in.)
21. PERFORM ROAD TEST
Check for abnormal noise, shock, slippage and smooth
operation.
22. RECHECK ENGINE COOLANT LEVEL

Advertisement

Table of Contents
loading

Table of Contents