Welch Allyn Connex Vital Signs Monitor 6000 Series Service Manual page 100

Hide thumbs Also See for Connex Vital Signs Monitor 6000 Series:
Table of Contents

Advertisement

94 Section A
2. Slide the NIBP module out of the case.
Reassembly notes
Install the NIBP module (the module closest to the display) before installing the
SpO2 and CO2 modules.
Insert the NIBP module into the housing with the serial number label facing up.
Connect the USB cable to the NIBP module.
If originally installed, install the blanking panel by sliding it into the housing.
Remove the bottom housing
Bottom housing for the standard chassis
No.
10
25
Item
Screw, plastite #4-20 X 0.500 Torx-pan head
Bottom housing metal chassis
®
Welch Allyn Connex
Vital Signs Monitor 6000 Series™
No.
Item
27
Bottom housing
28
Battery connector board

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents