Data Center Environment Checklist - Oracle EXADATA X6-2 Installation And Configuration Manual

Database machine
Hide thumbs Also See for EXADATA X6-2:
Table of Contents

Advertisement

Data Center
Room Checklist
Items
Will the new
hardware
location require
any non-standard
cable lengths?
Is the floor to
ceiling height a
minimum of 2914
mm (114.72
inches)?
Is the depth of
the raised floor a
minimum of 46
cm (18 inches)?
Related Topics:
Space Requirements
Flooring Requirements
Stabilize Oracle Exadata Rack with Leveling Feet
A.3 Data Center Environment Checklist
Use this checklist to ensure that the data center environment requirements have been
addressed.
Data Center
Environment
Considerations
Does the
computer room
air conditioning
meet
temperature and
humidity
requirements?
Does the
installation floor
layout satisfy the
ventilation
requirements?
Yes
No
(page 1-28)
(page 1-34)
Yes
No

Data Center Environment Checklist

N/A
Comment
(page 4-7)
N/A
Comment
Appendix A
A-5