Advertisement

Data Center
Environment
Considerations
If the room
cooling is from a
raised floor, then:
Are the
perforated
floor tiles
each rated at
400 CFM or
greater?
Can
additional
perforated
floor tiles be
obtained if
required for
additional
cooling?
Does the data
center air
conditioning
provide sufficient
front-to-back
airflow?
Is airflow
adequate to
prevent hot
spots?
Can the data
center
continuously
satisfy the
environmental
requirements?
Related Topics:
Temperature and Humidity Requirements
Ventilation and Cooling Requirements
Always provide adequate space in front and behind the rack to allow for proper
ventilation.
General Environmental Requirements
A.4 Access Route Checklist
Use this checklist to ensure that the access route requirements are addressed.
Yes
No
(page 1-45)
(page 1-1)

Access Route Checklist

N/A
Comment
(page 1-44)
Appendix A
A-6

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EXADATA X6-2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF