Chapter 4 Procedures Before Operation - Mitsubishi Electric NZ2GF12A4-16D User Manual

Cc-link ie field network waterproof/dustproof remote i/o module
Table of Contents

Advertisement

4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Station number setting
Set the station number of the I/O module with the station number setting switch.
Page 64 Station number setting with the station number setting switch
2.
Wiring
Wire a power supply, an Ethernet cable, and an external device to the I/O module.
Page 68 Wiring the Power Supply
Page 69 Wiring of Ethernet Cable
3.
Parameter setting and programming
Set parameters and create a program.
Page 72 Parameter Setting
 Page 77 Changing the Parameter
Page 103 PROGRAMMING
*1 To replace the module, refer to the point below.
To replace the module, follow the procedure described below:
• Turn off the module power supply and remove the I/O module.
• Prepare a new I/O module and perform the procedure above from "Station number setting" to "Parameter
setting and programming". (The network parameter of the master station does not need to be set again.)
• After checking the operation, restart the control.
4 PROCEDURES BEFORE OPERATION
60
*1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents