Download  Print this page

Mitsubishi Electric NZ2GF12A4-16D User Manual Page 101

Cc-link ie field network waterproof/dustproof remote i/o module.
Hide thumbs

Advertisement

■When "1: Without initial processing" is set
• When the data link is established, Remote READY (RWr0.b11) turns on.
• At the data link establishment, the external I/O function of the I/O module becomes enabled.
Remote READY (RWr0.b11)
Program
RY0
Module power supply
I/O module
Processing of the I/O module
External output signal Y0
(1) Processing executed at the startup
(2) Data link is established.
(3) The output is turned on.
Setting procedure
1.
Set "Method selection" to "Parameter write".
"CC IE Field Configuration" window  Select an I/O module in "List of stations".  [CC IE Field Configuration] 
[Online]  [Parameter Processing of Slave Station]
2.
Set "Initial operation setting" to "0: With initial processing" or "1: Without initial processing".
Item
Initial operation setting
When using the fast logic function, set parameters from a program at the startup of the I/O module. In such
case, set "Initial operation setting" to "0: with initial processing".
Controlled by the I/O module
Controlled by the program
(2)
ON
OFF
ON
OFF
ON
OFF
ON
(1)
OFF
Setting range
• 0: With initial processing
• 1: Without initial processing
(3)
8 FUNCTIONS
8.11 Initial Operation Setting Function
8
99

Advertisement

Table of Contents

   Related Manuals for Mitsubishi Electric NZ2GF12A4-16D

Comments to this Manuals

Symbols: 0
Latest comments: