Download  Print this page

Mitsubishi Electric NZ2GF12A4-16D User Manual Page 147

Cc-link ie field network waterproof/dustproof remote i/o module.
Hide thumbs

Advertisement

• When Without initial processing (1) is set
Initial processing request flag (RWr0.b8) does not turn on. The I/O module becomes operable (the update of external I/O
becomes enabled) without Initial processing completion flag (RWw0.b8) being turned on. When the module is powered on,
Remote READY (RWr0.b11) turns on and the initial processing is completed.
*3
Module power supply
Initial processing request flag
(RWr0.b8)
Initial processing completion
flag (RWw0.b8)
Parameter area
Remote READY (RWr0.b11)
*4
External input signal X0
RX0
*3 When data link starts at the same time of when the module is powered on
*4 When an external input device connected to X0 is on
(1) Setting values are read from the internal nonvolatile memory.
(2) The operation starts with the setting value A.
Controlled by the I/O module
Controlled by the program
ON
OFF
OFF
OFF
(1)
(2)
ON
OFF
ON
OFF
ON
OFF
(Setting value A)
APPENDICES
Appendix 2 Details of Remote Registers
A
145

Advertisement

Table of Contents

   Related Manuals for Mitsubishi Electric NZ2GF12A4-16D

Comments to this Manuals

Symbols: 0
Latest comments: