Download  Print this page

Changing The Parameter; Changing The Network Configuration - Mitsubishi Electric NZ2GF12A4-16D User Manual

Cc-link ie field network waterproof/dustproof remote i/o module.
Hide thumbs

Advertisement

7.2

Changing the Parameter

This section describes the procedure for changing the parameter.
The precautions for changing the parameter are the same as those in the following section.
Page 72 Precautions

Changing the network configuration

When changing the network configuration diverting the created project, set the parameter in the following procedure.
1.
Power off the module.
2.
Connect the modules again according to the desired network configuration.
3.
Power on the module.
4.
Open the "CC IE Field Configuration" window.
For the master/local module QJ71GF11-T2
Project window  [Parameter]  [Network Parameter]  [Ethernet/CC IE/MELSECNET]  [CC IE Field Configuration
Setting] button
5.
Drag and drop a module to set the slave station. Input a numerical value to set the station number of the station. Change
the value as necessary.
6.
Close the "CC IE Field Configuration" window.
[CC IE Field Configuration]  [Close with Reflecting the Setting]
7.
Click the [Refresh Parameters] button to display the refresh parameter setting window.
7 VARIOUS SETTINGS
7.2 Changing the Parameter
7
77

Advertisement

Table of Contents

   Related Manuals for Mitsubishi Electric NZ2GF12A4-16D

   Related Content for Mitsubishi Electric NZ2GF12A4-16D

Comments to this Manuals

Symbols: 0
Latest comments: