Quick Connect Cable Entry - Fisher FIELDVUE DVC6200f Instruction Manual

Digital valve controller for foundation fieldbus
Table of Contents

Advertisement

Instruction Manual
D103412X012
5. Replace and hand tighten the cover on the terminal box. To secure the terminal box cap engage the lock screw.
When the loop is ready for startup, apply power to the H1 card output.

Quick Connect Cable Entry

The DVC6200f is offered with a quick connect cable entry option, shown in figure 2‐25, for the
signal. The quick connect cable entry provides an easier and more reliable interface to fieldbus devices and support
modules by providing a standard connection.
Figure 2‐25. Quick Connect Connector
1/2‐14 NPT
NOTES:
1. COLORS ARE WIRE COLORS.
2. NC=NO CONNECTION.
18B9424‐A
Note
The quick connect cable entry option is only available for intrinsically safe and non‐incendive installations.
Refer to figure 8‐2 for identification of parts.
WARNING
Personal injury or property damage, caused by fire or explosion, can result from the discharge of static electricity. Connect
2
a 14 AWG (2.08 mm
) ground strap between the digital valve controller and earth ground when flammable or hazardous
gases are present. Refer to national and local codes and standards for grounding requirements.
To avoid static discharge from the plastic cover, do not rub or clean the cover with solvents. Clean with a mild detergent
and water only.
To avoid personal injury or property damage, do not use the Quick Connect option on instruments in explosion‐proof or
flameproof installations.
1. The quick connect cable entry should be installed on the digital valve controller at the factory. If it is, proceed to
step 3. If not continue with step 2.
2. To install the Quick Connect:
a. Remove the terminal box cap (key 4) from the terminal box (key 3).
b. Apply sealant to the threads of the quick connector.
c. Insert the wire pigtail into the desired conduit opening on the terminal box. Tighten the quick connector in the
conduit opening.
d. Cut and trim the wire ends.
1 (BLUE)
2 (BROWN)
3 (NC)
4 (GREEN/YELLOW)
Installation
July 2013
F
fieldbus
OUNDATION
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents