Sequence Of Operations For Starting Up Profibus Boards (Cbp2) - Siemens SIMOTRAS 6SG7050 Operating Instructions Manual

6sg70 series
Table of Contents

Advertisement

Start-up

7.10.2 Sequence of operations for starting up PROFIBUS boards (CBP2)

Switch off the power supply and insert the board or adapter with board. For board mounting
1
instructions, see Section 5, Mounting Optional Supplementary Boards.
The following are important communication parameters. Index 1 of each parameter is set for
2
st
the 1
communication board (1
U712 PPO type, definition of the number of words in the parameter and process data
-
- U722 Telegram failure time for process data (0 = deactivated)
P918 Bus address
-
P927 Parameterization enable (need only be set if parameters are to be assigned via
-
The process data of the 1
-
appropriate connectors and binectors (see Section 8, function diagrams Z110 and Z111)
For meaning of bits of control and status words, please see Section 8, Sheets G180 to
G183.
Turn the electronics supply voltage off and on again or set U710.001 or U710.002 to "0" to
3
transfer the values of parameters U712, U722 and P918 to the supplementary board.
The CBP2 (Communication Board PROFIBUS) serves to link drives and higher-level automation
systems via the PROFIBUS-DP. For the purpose of PROFIBUS, it is necessary to distinguish
between master and slave converters.
Masters control the data traffic via the bus and are also referred to as active nodes . There
are two classes of master:
DP masters of class 1 (DPM1) are central stations (e.g. SIMATIC S5, SIMATIC S7 or
SIMADYN D) which exchange data with slaves in predefined message cycles.
DPM1s support both a cyclic channel (transmission of process data and parameter data)
and an acyclic channel (transmission of parameter data and diagnostic data).
DP masters of class 2 (DPM2) are programming, configuring or operator
control/visualization devices (e.g. DriveMonitor) which are used in operation to configure,
start up or monitor the installation.
DPM2s support only an acyclic channel for transferring parameter data.
The contents of the data frames transferred via these channels are identical to the structure
of the parameter section (PKW) as defined by the USS specification.
7-28
section of the telegram (required only if the PPO type cannot be set via PROFIBUS-
DP master)
The DP master configuring data determine whether the slave (CBP2) must monitor
telegram traffic with the master. If this monitoring function is activated, the DP master
passes a time value (watchdog time) to the slave when the link is set up. If no data
are exchanged within this period, the slave terminates the process data exchange
with the SIMOTRAS HD converter. The latter can monitor the process data as a
function of U722 and activate fault message F082.
PROFIBUS)
st
or 2
WARNING
This initialization process will interrupt the communication of any supplementary
board that has already been started up.
st
CB) and index 2 for the 2
nd
communication board are connected by means of the
nd
communication board (2
SIEMENS AG
6SG7000-0BA76
SIMOTRAS HD
Operating Instructions
01.04
nd
CB):

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents