Topping Up The Cooling Liquid Reservoir - Barco HDQ 2K40 User Manual

Hide thumbs Also See for HDQ 2K40:
Table of Contents

Advertisement

16. Maintenance
Image 16-3
Checking the cooling liquid level
If the current cooling liquid level is somewhere between Min and Max, no action is required.
If the current cooling liquid level is approaching the Min level point, check for leakage in the cooling system prior to starting the
topping up procedure.
If the cooling liquid level is not visible, open the filler cap and shine a torch into the reservoir.

16.6 Topping up the cooling liquid reservoir

W
ARNING
W
ARNING
(approximately 25 °C). The projector should have sufficiently cooled down (minimum 2 hours).
W
ARNING
ing this may lead to irreversible damage of the projector.
W
ARNING
Not for household use. Keep out of reach of children. Harmful by oral intake. Avoid exposure to pregnant
women. Avoid contact with eyes, skin and clothing. Avoid inhalation of the noxious fumes.
C
AUTION
Handling the cooling liquid
Avoid contact of the liquid with Eyes, Skin and Clothing.
Avoid inhaling noxious fumes.
Conserve the product in the original package and in a well ventilated room.
302
:
The procedure below may only be performed by "qualified service technicians".
:
All actions performed on the Liquid Cooling Circuit should occur in normal ambient conditions
:
Only use Barco approved cooling liquid to refill the liquid cooling circuit of the projector. Neglect-
:
Hazardous product: Blue antifreeze diluted 1,2 ethanediol (1/3 ethanediol – 2/3 Demi water).
:
Tighten the filler cap sufficiently to avoid cooling liquid leakage. Tighten to a torque of 7 Nm.
R5905303 HDQ 2K40 02/03/2015

Advertisement

Table of Contents
loading

Table of Contents