2. GENERAL

About this chapter
Read this chapter before installing your Barco HDQ 2K40. It contains important information concerning installation requirements for
the HDQ 2K40, such as minimum and maximum allowed ambient temperature, humidity conditions, required safety area around the
installed projector, required power net, etc.
Furthermore, careful consideration of things such as image size, ambient light level, projector placement and type of screen to use
are critical to the optimum use of the projection system.
Barco provides a guarantee relating to perfect manufacturing as part of the legally stipulated terms of guar-
antee. Observing the specification mentioned in this chapter is critical for projector performance. Neglecting
this can result in loss of warranty.
W
ARNING
damage to the frame. This can cause the frame to break and the projector to fall down.
Image 2-1
Overview

Installation requirements

Unpacking the projector
Initial inspection
Air inlets and outlets
Free download of Projector Toolset
Installation process overview
2.1
Installation requirements
Environment conditions
Table below summarizes the physical environment in which the HDQ 2K40 may be safely operated or stored.
Environment
Ambient Temperature
Humidity
Altitude
Let the projector acclimatise after unpacking. Neglecting this may result in a startup failure of the Light Pro-
cessor Unit.
R5905303 HDQ 2K40 02/03/2015
:
Never transport the HDQ 2K40 projector in an upside down position. Failure to do so can cause
Operating
10 °C (50 °F) to 35 °C (95 °F)
5% to 85% RH Non-condensed
-60 (-197Ft) to 3000m (9843Ft)
Non-Operating
-15°C (5°F) to 60°C (140°F)
5% to 95% RH Non-Condensed
-60 (-197Ft) to 10000m (32810Ft)