Edit A Task - Barco HDQ 2K40 User Manual

Hide thumbs Also See for HDQ 2K40:
Table of Contents

Advertisement

14. Projector Control
The task is added to the list of tasks.

14.12.2 Edit a task

What can be done?
An existing task in the list of tasks can be edited and saved with the same name.
How to edit
1. Press Menu to activate the menus and select Projector Control → Scheduler → Edit task.
Image 14-116
Main menu, projector control
Image 14-118
Scheduler, edit task
2. Press ENTER to open the task selection list.
Image 14-119
Task selection list
3. Use the ▲ or ▼ key to select the desired task and press ENTER
266
Image 14-117
Projector control, scheduler
R5905303 HDQ 2K40 02/03/2015

Advertisement

Table of Contents
loading

Table of Contents