To Install A Capillary Column In The Ecd - Agilent Technologies 8860 Maintaining

Gas chromatograph
Hide thumbs Also See for 8860:
Table of Contents

Advertisement

11 Maintaining the ECD

To Install a Capillary Column in the ECD

To Install a Capillary Column in the ECD

1 Gather the following:
2 Launch the GC maintenance wizard: Maintenance > Column > Perform Maintenance >
Be careful! The oven and/or detector may be hot enough to cause burns. If the detector is
WAR N IN G
hot, wear gloves to protect your hands.
Wear safety glasses to protect your eyes from flying particles while handling, cutting, or
WAR N IN G
installing glass or fused silica capillary columns. Use care in handling these columns to
prevent puncture wounds.
3 Load the
Wear clean, lint-free gloves to prevent contamination of parts with dirt and skin oils.
C AU T I O N
4 Place a septum (if the column id is ≤0.2 mm), capillary column nut, and ferrule on the
Ferrule
Column nut
Septum
5 Score the column using a glass scribing tool. The score must be square to ensure a clean
180
Ferrule, see
"Consumables and Parts for the ECD"
Column nut
Septum
Column
1/4-inch, 5/16-inch, and 9/16-inch wrenches
Column cutter
Lint-free gloves
Install Column > Start Maintenance. Wait for the GC to become ready.
The wizard will guide you through the maintenance steps described below.
inlet maintenance method
column.
break.
on page 174.
and wait for the GC to become ready.
Maintaining Your GC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents