Agilent Technologies 8860 Maintaining page 73

Gas chromatograph
Hide thumbs Also See for 8860:
Table of Contents

Advertisement

6
Maintaining the Purged Packed Inlet
To Install a Capillary Column with the Purged Packed Inlet
18 After the column is installed at both inlet and detector, establish a flow of carrier gas and
19 Restore the analytical method.
20 After the GC becomes ready, wait 10 minutes then ignite the detector flame or adjust
Be careful! The oven, inlet, and/or detector may be hot enough to cause burns. If the oven,
WAR N IN G
inlet, or detector is hot, wear heat-resistant gloves to protect your hands.
21 Allow the oven, inlet, and detector to equilibrate at operating temperature, then retighten
Maintaining Your GC
purge as recommended by the column manufacturer.
For FPD+, immediately turn off the flame.
For NPD, immediately turn off the bead.
offset on the NPD bead.
the fittings.
73

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents