MX480 Site Preparation Checklist

The checklist in
Table 80 on page 177
router installation.
Table 80: Site Preparation Checklist
Item or Task
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
Select the type of rack or cabinet.
Plan rack or cabinet location, including
required space clearances.
If a rack is used, secure rack to floor and
building structure.
Acquire cables and connectors.
Locate sites for connection of system
grounding.
Measure distance between external power
sources and router installation site.
summarizes the tasks you must perform when preparing a site for
For More Information
"MX480 Router Environmental
Specifications" on page 180
"MX480 Router Rack
Requirements" on page
"MX480 Router Cabinet Size and
Clearance Requirements" on
page 188
"MX480 Router Rack
Requirements" on page
"MX480 Router Clearance
Requirements for Airflow and
Hardware Maintenance" on
page
187,
"MX480 Router Cabinet Size and
Clearance Requirements" on
page 188
"MX480 Router Rack
Requirements" on page 185
"MX480 Chassis Grounding
Specifications" on page
MX480 Router Grounding Cable Lug
Specifications,
MX480 Router Grounding Cable
Specifications
Performed By
185,
185,
182,
177
Date

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents