Site Preparation Checklist For Acx7100-32C Routers - Juniper ACX7100-32C Hardware Manual

Cloud metro router
Hide thumbs Also See for ACX7100-32C:
Table of Contents

Advertisement

Site Preparation Checklist for ACX7100-32C
Routers
The checklist in
Table 15 on page 31
for an ACX7100-32C router installation.
Table 15: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
Power
Measure the distance between external
power sources and router installation
site.
Calculate the power consumption and
requirements.
Rack or Cabinet
Verify that your rack or cabinet meets
the minimum requirements for the
installation of the router.
summarizes the tasks you need to perform when preparing a site
For More Information
"Environmental Requirements
and Specifications for
ACX7100-32C Routers" on page
35
"AC Power Specifications for
ACX7100-32C Routers" on page
22
"DC Power Specifications for
ACX7100-32C Routers" on page
27
"Rack Requirements for
ACX7100-32C Routers" on page
39
Performed by
Date
31

Advertisement

Table of Contents
loading

Table of Contents