Site Preparation Checklist For Acx500 Routers - Juniper ACX500 Hardware Manual

Universal metro router
Hide thumbs Also See for ACX500:
Table of Contents

Advertisement

Site Preparation Checklist for ACX500 Routers

The checklist in
Table 18 on page 76
for ACX500 router installation.
Table 18: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
Power
Measure the distance between external
power sources and router installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of routers
you want to install.
Rack, Cabinet, Wall or Pole
summarizes the tasks you need to perform when preparing a site
For More Information
"ACX500 Router Environmental
Specifications" on page 89
"ACX500 Router Grounding
Specifications" on page 91
"ACX500 DC Power
Specifications" on page 73
"ACX500 Universal Metro Router
Overview" on page 2
Performed by
Date
76

Advertisement

Table of Contents
loading

Table of Contents