Preparation Overview; M7I Router Site Preparation Checklist; Table 41: Site Preparation Checklist - Juniper M7i Hardware Manual

Multiservice edge router
Hide thumbs Also See for M7i:
Table of Contents

Advertisement

CHAPTER 9

Preparation Overview

M7i Router Site Preparation Checklist

Copyright © 2019, Juniper Networks, Inc.
M7i Router Rack Requirements on page 75
The checklist in
Table 41 on page 73
preparing a site for router installation.

Table 41: Site Preparation Checklist

Item or Task
Verify that environmental factors such as
temperature and humidity do not exceed router
tolerances.
Measure distance between external power
sources and router installation site.
Select the type of rack.
Plan rack location, including required space
clearances.
Secure rack to floor and building structure.
Acquire cables and connectors.
Locate sites for connection of system
grounding.
Calculate power budget and power margin.
summarizes the tasks you need to perform when
Performed By
Date
Notes
73

Advertisement

Table of Contents
loading

Table of Contents