Turn On And Initialization Steps - Agilent Technologies G1367A Reference Manual

1100 series well-plate sampler & micro well-plate sampler
Table of Contents

Advertisement

3
Troubleshooting and Test Functions

Turn ON and initialization steps

A successful WPS turn-on/initialization takes about 3.5 minutes, and consists
of five steps
1 WPS turn on, begins when the main power button is pushed ON. Power
2 Main fan and exhaust fan turn-on immediately.
3 Main board self-test begins. Status indicator tests red, green and yellow,
4 The vapor blowout period begins. This lasts for about 2 minutes.
5 WPS sample transport and sampling unit initialization begins at the
StatusLED
Power LED
Figure 15
94
indicator turns green. Front cover latch activates immediately.
than goes to yellow. This takes about 20 seconds (from turn-on). The status
indicator remains yellow until the initialization process is complete. The
user interface indicates "initializing" during this period.
2-minutes mark (from turn-on), if the front cover is closed. If the front cover
is open at the 2 minutes mark, initialization will start only when the front
cover is closed. Initialization takes about 1.5 minutes. When initialization is
complete the needle is in the needle seat, the needle lock is down, and the
status indicator is off.
Instrument LED indicator
1100 Series WS MWS Reference Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

G1377a

Table of Contents