4
Repairing the Sampler
Installing the SUD board
1 Install the new board. Ensure the board is positioned between the board
2 Secure the board in place with the two screws.
3 Reconnect all the connectors to the new board.
4 Install the sampling unit, (see
5 Install the sample transport, (see
6 Install the top cover, top plate, and foam (see
7 Replace the plate tray in the tray base.
8 Turn ON the sampler, close the front door.
9 The system will reset automatically.
10 In the user interface perform a "Sample Transport Self Alignment".
150
guide.
page 133)
page 132).
"Installing the sampling unit"
"Installing the sample transport"
"Top Cover and Foam"
1100 Series WS MWS Reference Manual
on page 135).
on
on