Toyota 1 MZ–FE Manual page 332

Table of Contents

Advertisement

EG2–332
1MZ–FE ENGINE
COOLING SYSTEM
4. CONNECT ENGINE COOLANT TEMPERATURE
SENSOR (ECT) CONNECTOR
5. CONNECT ENGINE WIRE
Connect the engine wire to the water inlet and cylin–
der head with the 2 nuts.
6. CONNECT HYDRAULIC MOTOR PRESSURE HOSE
Connect the pressure hose with the bolt.
Torque: 8 N–m (80 kgf–cm, 69 in.–Ibf)
7. CONNECT HEATER HOSE
8. REINSTALL AIR CLEANER CAP, VOLUME AIR
FLOW METER AND AIR CLEANER HOSE
(a) Connect the air cleaner hose, and install the air clean–
er cap and volume air flow meter with the 4 clips.
(b) Tighten the air cleaner hose clamp bolt.
(c) Connect the PCV hose.
(d) Connect the accelerator cable clamp.
(e) Connect the volume air flow meter connector and
wire clamp.
9. FILL WITH ENGINE COOLANT
Capacity:
8.7 liters (9.2 US qts, 7.7 Imp. qts)
10. CONNECT NEGATIVE (–) TERMINAL CABLE TO
BATTERY
11. START ENGINE AND CHECK FOR LEAKS
12. RECHECK ENGINE COOLANT LEVEL

Advertisement

Table of Contents
loading

Table of Contents