Toyota 1 MZ–FE Manual page 327

Table of Contents

Advertisement

1MZ–FE ENGINE
COOLING SYSTEM
6. INSTALL LH CAMSHAFT TIMING PULLEY
(a) Install the timing pulley, facing the flange side inward.
(b) Align the knock pin hole of the camshaft with the
knock pin groove of the timing pulley as shown.
(c) Using SST, install and torque the bolt.
SST 09960–10010 (09962–01000)
Torque: 125 N–m (1,300 kgf–cm, 94 ft–lbf)
7. INSTALL TIMING BELT
(See steps6 to 27 on pages
8. FILL WITH ENGINE COOLANT
Capacity:
8.7 liters (9.2 US qts, 7.7 Imp. qts)
9. CONNECT NEGATIVE (–) TERMINAL CABLE TO
BATTERY
10. START ENGINE AND CHECK FOR LEAKS
11. RECHECK ENGINE COOLANT LEVEL
EG2–51
to 56)
EG2–327

Advertisement

Table of Contents
loading

Table of Contents