1MZ–FE ENGINE
–
SFI SYSTEM
B. Inspect relay operation
(a) Apply battery voltage across terminals ST and El.
M Using an ohmmeter, check that there is continuity
between terminals +B and FP.
If operation is not as specified, replace the relay.
4. REINSTALL CIRCUIT OPENING RELAY
5. RECONNECT NEGATIVE (–) TERMINAL CABLE
TO BATTERY
EG2–281