Toyota 1 MZ–FE Manual page 257

Table of Contents

Advertisement

1MZ–FE ENGINE
SFI SYSTEM
(c) Connect the following vacuum hoses:
(1) Vacuum hose to VSV for ACIS
(2) Vacuum hose to EGR vacuum modulator
(3) Vacuum hose to EGR valve
(4) Vacuum hose (from cylinder head rear plate)
(5) Vacuum hose from air intake chamber
(6) Vacuum hose to fuel pressure regulator
9. INSTALL V–BANK COVER
Using a 5 mm hexagon wrench, install the V– bank
cover with the 2 cap nuts.
HINT: For fixing the V – bank cover, push on the cover
until sense of "click" is felt.
10. INSTALL AIR CLEANER HOSE
(a) Connect the air cleaner hose with the 2 hose clamps.
(b) Connect the PCV hose.
11. CONNECT THROTTLE CABLE
12. CONNECT ACCELERATOR CABLE
13. FILL WITH ENGINE COOLANT
Capacity:
8.7 liters (9.2 US qts. 7.7 Imp. qts)
14. CONNECT NEGATIVE (–) TERMINAL CABLE
TO BATTERY
EG2–257

Advertisement

Table of Contents
loading

Table of Contents