Toyota 1 MZ–FE Manual page 112

Table of Contents

Advertisement

EG2–112
1MZ–FE ENGINE
ENGINE MECHANICAL
28. INSTALL TIMING BELT
(See steps 6 to 27 on pages
29. INSTALL FRONT EXHAUST PIPE
(a) Temporarily install 3 new gaskets and the front ex–
haust pipe with the 2 bolts and 6 nuts.
(b) Tighten the 4 nuts holding the exhaust manifolds to
the front exhaust pipe.
Torque: 62 N–m (630 kgf–cm, 46 ft–lbf)
(c) Tighten the 2 bolts and 2 nuts holding the three–way
catalytic converter to the front exhaust pipe.
Torque: 56 N–m (570 kgf–cm, 41 ft–lbf)
(d) Connect the bracket with the 2 bolts.
Torque: 19 N–m (195 kgf–cm, 14 ft–lbf)
(e) Connect the front exhaust pipe clamp with the 2 bolts.
Torque: 29 N–m (300 kgf–cm, 22 ft–lbf)
30. INSTALL SPARK PLUGS
Using a 16 mm plug wrench, install the6 spark plugs
to the RH and LH cylinder heads.
31. INSTALL IGNITION COILS
Install the6 ignition coils to the RH and LH cylinder
heads.
Torque: 8 N–m (80 kgf–cm, 69 in.–lbf)
EG2–51
to 66)

Advertisement

Table of Contents
loading

Table of Contents