Sign In
Upload
Manuals
Brands
Avaya Manuals
Server
1000M
Avaya 1000M Manuals
Manuals and User Guides for Avaya 1000M. We have
2
Avaya 1000M manuals available for free PDF download: Installation And Commissioning Manual, Upgrade
Avaya 1000M Installation And Commissioning Manual (436 pages)
Communication Server
Brand:
Avaya
| Category:
Server
| Size: 4.52 MB
Table of Contents
Contents
5
Table of Contents
5
Features
13
New in this Release
13
Other
13
List of Procedures
17
Customer Service
25
Subject
27
System Information
27
Applicable Systems
28
Intended Audience
29
Conventions
30
Related Information
31
Contents
33
Introduction
33
Overview
33
Avaya Communication Server 1000 Task Flow
34
Upgrade and New Install Wizards
34
Summary of Procedures
37
Contents
41
Preparing for Installation
41
Requirements
41
System Equipment - Uems
42
Card Cage
46
System Options
49
Signaling Server
56
Cable Routing Guidelines
58
Equipment Handling Precautions
62
Handling Circuit Cards
63
Preparing the Equipment for Installation
66
Contents
69
Overview
69
Placing the Fourth Module on a Column
69
Contents
75
Positioning and Leveling Equipment
75
Positioning and Leveling the Equipment
75
Contents
81
Installing Overhead Cable Tray Kits
81
AC-Powered Systems
85
Contents
85
Installing AC Power
85
Safety Ground/Protective Earth and Logic Return Wiring
86
Installing Safety Ground/Protective Earth and Logic Return Wiring
90
Installing UPS Ground Cabling
93
Contents
97
DC-Powered Systems
97
Installing DC Power
97
Candeo DC Power Systems
98
Large Candeo Modules
101
Small Candeo Modules
105
Installation Reference Guide
110
Configuration Reference Guide
112
Safety Ground/Protective Earth and Logic Return Wiring
113
Cabling and Connecting the Grounding Leads
114
Connecting the Power Plant Frame Ground (or Safety Ground) Leads
115
Four-Feed PDU
121
Installing the Four-Feed PDU
127
Installing Safety Ground/Protective Earth Wiring
127
Connecting Power from the Power Plant to the PDU
129
Connecting UK Power to the Four-Feed PDU
133
System Monitor Connections
134
About Terminations
137
Contents
137
Installation and Designation
137
Planning and Designating a Main Distribution Frame
137
Installing the BIX Cross-Connect Terminal
138
Terminal Block Requirements
138
Miscellaneous Equipment
139
Installing the Krone Cross-Connect System (UK)
142
Contents
149
Installing Power Failure Transfer Units
149
PFTU Configurations
149
Installing a PFTU
152
Connecting Trunks and Telephones
153
Installing QUA6 Pftus
154
Configuring the System Monitor
155
Contents
155
System Monitor Cabling
155
Configuring the System Monitor
157
Cabling the System Monitor
161
Alarm Interfacing to Candeo
169
Configuring the Alarm Ports
172
Customizing Alarms
173
About the System Terminal
175
Connecting a System Terminal or Modem
175
Contents
175
Connecting a Terminal
177
Connecting a Terminal to a COM Port
178
Connecting a Switch Box and Terminal to COM1 and COM2 Ports
179
SDI and COM1 Ports
181
Connecting a Switch Box and Terminal to SDI and COM1 Ports
181
Connecting a Modem
182
Configuring a Modem
184
Connecting a Modem to an SDI Port
185
Connecting a Modem to Switch Box, COM2 Ports, SDI Ports
187
Cabling Common Equipment in a Single Group System
191
Cabling Guidelines
191
Contents
191
Core/Net Module
193
Cabling the Core Side
197
Cabling the I/O Panel
199
Cabling the Network Side
201
Configuring and Cabling the Clock Controllers
202
Connecting the 3PE Faceplates in the Core/Net Modules
203
Network Group 0: Shelf 0 to Shelf 1
203
Inspecting CNI to 3PE Factory Installed Cables
204
Connecting the Core/Net Backplanes
206
Optioning the System Utility Card
207
Connecting Core Modules to a LAN
208
Cabling Common Equipment in a
210
Cabling Common Equipment in a Multi Group System
211
Cabling Guidelines
211
Contents
211
Core/Net Module
213
Cabling the Core/Net Module Backplane
216
Disconnecting Cables from the Core/Net Module Backplane
217
Optioning the System Utility Card
219
Core Shelf Cabling
220
Installing the CP PIV to I/O Panel Cables
224
Connecting the Core Module to a LAN
227
Cabling a Dual Ring Fiber Network
228
FIJI Card Cabling
232
Installing the Shelf 0 Fiber Optic Ring (Ascending)
236
Installing the Shelf 1 Fiber Optic Ring (Descending)
237
FIJI to FIJI Cabling
239
Connecting the Clock Controller Cables
240
Cabling Lines and Trunks
245
Contents
245
Overview
245
Cabling an IPE Module or Media Gateway
247
Connecting Lines and Trunks
250
Contents
283
Installing the Security Device
283
Overview
283
Powering up the System and Initial Loading
283
Connecting the AC Power Source
286
Preparing to Power up - AC
286
Turning AC Power on
287
Resetting the Main Circuit Breakers (AC Power)
288
Preparing to Power up - DC
290
Turning DC Power on
290
Installing Software
292
Software Installation
293
Testing Core/Net 1 and Core/Net 0
314
Acceptance Tests
319
Contents
319
Performing Acceptance Tests
319
Testing the Module Power Supply
320
Testing the Blower Unit and Thermal Sensor
321
Testing the Sysload
323
Testing the System Terminal and System Monitor
324
Testing the PFTU
325
Contents
327
Installing Earthquake Bracing
327
Seismic-Approved Applications
327
Installing Seismic Bracing
328
Drilling Concrete Floors
331
Installing Kit a and Kit B Anchor Plates
333
Installing Earthquake Rods
335
Positioning and Leveling the System
341
Installing Non-Seismic Bracing
342
Installing a Non-Seismic Anchor Kit
343
Adding a Module to a Column
347
Contents
347
Overview
347
Adding a Module to the Base of a Column
348
Adding a Module between Two Other Modules
354
Adding a Module to the Top of a Column
358
Cabling Network Modules and Loops
367
Contents
367
Network-To-Network Cabling
367
Connecting the 3PE Faceplates in the Core/Net Modules
368
Network Group 0: Shelf 0 to Shelf 1
368
Network Module Connections
368
Connecting the Core/Net Backplanes
369
Connecting Groups 1 through 7: Shelf 0 to Shelf 1
370
Connecting the Network Modules to the Core/Net Modules
373
Connecting the 3PE Cables to the 3PE Fanout Panels
378
Cabling a Superloop Network Card - Single Column
380
Cabling a Superloop Network Card - Multiple Columns
384
Panel Connections
387
Contents
389
Introduction
389
Lnstalling a Signaling Server
389
Signaling Server Task Flow
390
Readiness Checklist
392
Server Card Hardware Installation
394
Connections
408
Upgrading and Reconfiguring the Software
416
Before You Begin
421
Index
429
Advertisement
Avaya 1000M Upgrade (215 pages)
CS 1000M SG CP PIV
Brand:
Avaya
| Category:
Server
| Size: 3.8 MB
Table of Contents
Table of Contents
5
New in this Release
9
Features
9
Other
9
Customer Service
13
Navigation
13
Getting Technical Documentation
13
Getting Product Training
13
Getting Help from a Distributor or Reseller
13
Getting Technical Support from the Avaya Web Site
14
System Information
15
Subject
15
Signaling Server Configuration
16
Applicable Systems
16
System Migration
16
Conventions
17
Intended Audience
17
Related Information
18
Upgrading
21
Introduction
21
Contents
21
Meridian 1 Option 61C Upgrade to Option 61C CP PIV
21
Preparing and Planning for the Upgrade
25
Contents
25
Introduction
26
Planning
27
Database Requirements
27
Avaya Communication Server 1000 Task Flow
29
Upgrade Checklists
31
Identifying the Proper Procedure
31
Preparing
31
Connecting a Terminal
32
Checking the Core ID Switches
33
Core Card Placement in the NT4N40 Core/Net Card Cage
34
Printing Site Data
35
Core Module ID Switch
35
Print Site Data
36
Performing a Template Audit
38
Backing up the Database (Data Dump and ABKO)
39
Performing an ABKO (Save the Database to Floppies)
40
Converting the 4 Mbyte Database Media to 2 Mbyte Database Media
42
Making the RMD Bootable
43
(Customer Database Media Converter Tool)
45
Transferring the Database from Floppy Disk to CF (Customer Database Media Converter Tool)
45
Identifying Two Unique IP Addresses
51
Check Requirements for CNI to 3PE Cables (NTND14)
52
Performing the Upgrade
53
Reviewing Upgrade Requirements
53
Check Software Received
53
Contents
53
Check Equipment Received
54
Check Vintage Requirements for Existing Hardware
54
Check Required Hardware (AC and DC)
55
AC Requirements
56
System Requirements
57
Installing Core 1 Hardware
58
Check for the Shelf Power Cable
59
Core Card Placement in the NT4N41 Core/Net Module
59
Check Factory-Installed Cables
60
Core/Net Cable Connections
61
Disable and Remove Equipment from Core 1
62
Splitting the Cores
63
Software Disable Network Cards in Core/Net 1 from Core/Net 0
64
Removing the System Monitors from the Core Column
66
Power down Core/Net 1
67
DC Power Connectors on the Core Module Backplane
69
AC Power Connectors on the Core Module Backplane
70
Installing the CP Card Cage in Core 1
72
Location of the Screws for the MPDU
73
CP PIV Call Processor Card
75
Relocating Network Cards to CP PIV Core/Net 0
76
Moving Clock Controller 1
76
Clock Controller Switch Settings for NTRB53
78
Installing the Security Device
79
Unpack and Install Power Supply
81
Cable Core 1
82
Power up Core 1
82
Fanout Panel Connections on the CP Core/Net Backplane
83
Power up Core Cards
84
Restore Power
84
CS 1000 Release 7.5 Upgrade
84
Upgrading the Software
85
Verifying the Upgraded Database
101
Configuring IP Addresses
102
Check for Peripheral Software Download to Core 1
103
Reconfiguring I/O Ports and Call Registers
105
Reboot Core/Net 1
106
Installing Core 0 Hardware
107
Power down Core/Net 0
108
Removing Core 0 Cables and Card Cage
108
Installing the CP Card Cage in Core 0
113
Moving Clock Controller 0
117
Clock Controller Switch Settings for QPC471H, QPC771H
119
Cable Core 0
122
Inspect the NT4N29 Cables
122
Installing Intermodule Cables
122
Unpack and Install the Power Supply
124
Connect LAN 1
124
3PE Card Connections
124
Connect LAN 2
125
If the System Is Connected to a LAN
125
Power up Core 0
126
Preparing for Power up
126
Options for LAN 1 Connection
126
Powering up Core Cards
127
Test Core/Net 1
128
Contents
135
Making the System Redundant
146
Completing the CP PIV Upgrade
150
Testing the Cores
151
Switching Call Processing
154
Testing Core/Net 0
154
Performing a Customer Backup Data Dump (Upgraded Release)
156
Lnstalling a Signaling Server
159
Contents
159
Introduction
159
Signaling Server Task Flow
160
Readiness Checklist
162
Server Card Hardware Installation
164
Installation in a Communication Server 1000M System
165
Contents
166
NN43021-461 Standard 06.03 June
176
Connections Checklist
179
Connecting a Signaling Server
180
Connecting a Server Card to the ELAN and TLAN Subnets
180
Connecting an IBM COTS Server
182
Connecting an HP COTS Server
184
Connecting a Dell COTS Server
186
Upgrading and Reconfiguring the Software
187
IP Subnet Configuration
187
Element Manager Logon Page
190
Signaling Server Properties
192
Upgrade the CP PM BIOS
193
Installing the CS 1000 Linux Base
198
Installing Linux Applications
198
Joining the UCM Security Domain
198
Large System Upgrade Checklists
201
Appendix A: Upgrade Checklists
201
Contents
201
Introduction
201
Site Details
202
Upgrade Details
202
Preupgrade Checklists
203
Preconversion Steps
206
Postconversion Checks
208
IGS Cabling Chart
208
Quick Reference
208
Switch Settings
210
Index
213
Advertisement
Related Products
Avaya callpilot 1002rp
Avaya CallPilot 1005r
Avaya Converged Platform 130 Series
Avaya Meridian 1 61C
Avaya CallPilot 1006r
Avaya 120 Series
Avaya 1000E
Avaya 1000 Series
Avaya PW5115 1000iRM
Avaya Media Gateway 1000E PRI
Avaya Categories
IP Phone
Telephone
Server
Switch
Gateway
More Avaya Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL