Installing Software - Avaya 1000M Installation And Commissioning Manual

Communication server
Hide thumbs Also See for 1000M:
Table of Contents

Advertisement

Page 292 of 436

Installing software

Before you begin
NN43021-310
Standard 06.01
Powering up the system and initial loading
8
Make sure the green lights in all the module power supplies are lit before
proceeding to the next column. The red LED for each column remains lit
until the system reloads.
Once the system is running, reattach all covers and panels to the modules
and columns. Module covers must be kept on so the air from the pedestal
fans will be directed up through all the modules and out the exhaust vents
in the top cap. When the module covers are removed, the upper modules
are not cooled properly because the air escapes from the open module
door.
If the module covers are left off and the system overheats, circuit cards
will malfunction and, in extreme cases, melt.
This section contains information about initial software installation
procedures.
Dependency Lists (DepLists) are the Avaya recommended Product
Enhancement Packages (PEP) for a software release. As common practice,
ensure that you have the latest issue of the DepLists at the time of system
installation. The issue and date of the DepLists is shown on the software
CD-ROM. For more information about the most recent issue of DepLists for
this software release, see the Enterprise Solution PEP Library.
If the software CD-ROM does not contain the most recent issue of the
DepLists, download the DepList zip file from the Meridian PEP Library to a
PC Card. After you run the Software Installation Program (see Procedure 48
on
page
293), use the Matrix DepList and PEPs (MDP) commands to install
the Dependency Lists from the zip file.
For more information about accessing and using DepLists, see the Product
Matrix Dependency List User Guide, available on the Enterprise Solution
PEP Library.
March 2013
End of Procedure

Advertisement

Table of Contents
loading

Table of Contents