Installing earthquake rods

Procedure 59
Installing Kit B
1
Locate the two mounting plates for each column over the anchor holes.
Insert the anchors into the holes and tap the anchors into place with a
mallet.
2
Level the plates with shims. Leave the stack of shims exposed until all
leveling has been completed (this will allow the addition or removal of
shims if necessary).
3
If the installation must meet CALIFORNIA OSHPD, tension proof load
testing is required on 50% of the anchor bolts. These anchors must be
tested to 6230 N (1400 lb) tension and 122 J (90 ft-lb) torque. Any failure
requires testing of all remaining anchors.
4
Go to "Installing earthquake rods" on
The following tools are required to install the rods:
7.5 mm (5/16 in.) socket wrench
12.7 mm (1/2 in.) open-end wrench for rods
14.3 mm (9/16 in.) open-end wrench for nuts
Note: The earthquake rods should be installed before you position the
columns.
Installing earthquake bracing
page
End of Procedure
Large System Installation and Commissioning
Page 335 of 436
335.