Server Card Hardware Installation - Avaya 1000M Upgrade

Cs 1000m sg cp piv
Table of Contents

Advertisement

Page 162 of 212
Table 19
Readiness checklist (Part 2 of 2)
Have you:
Checked for correct grounding facilities?
Obtained the following
• screwdrivers
• an ECOS 1023 POW-R-MATE or similar type of multimeter
• appropriate cable terminating tools
• a computer (maintenance terminal) to connect directly to the Signaling Server, with
— teletype terminal (ANSI-W emulation, serial port, 9600 bps)
— a Web browser for Element Manager (configure cache settings to check for new
Web pages every time the browser is invoked, and to empty the cache when the
browser is closed)
Prepared the network data as suggested in Converging the Data Network with VoIP
(NN43001-260) or Communication Server 1000M and Meridian 1 Large System
Planning and Engineering (NN43021-220), as appropriate for your Communication
Server 1000 system?
Read all safety instructions in Communication Server 1000M and Meridian 1 Large
System Installation and Commissioning (NN43021-310), as appropriate for your
Communication Server 1000 system?

Server card hardware installation

NN43021-461
Standard 06.03
lnstalling a Signaling Server
This section contains instructions for installing a Server in a Communication
Server 1000M system. The Communication Server 1000M system supports
the NTDW66 CP PM card, NTDW54 CP DC card, and Comercial
off-the-shelf (COTS) servers.
This section contains only general instructions to install the Server card in
Communication Server 1000M systems. For more detailed installation
June 2014

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1 61c

Table of Contents