Preparing for installation

Preparing the equipment for installation

NN43021-310
Standard 06.01
Use the equipment room floor plan to position equipment. See
Communication Server 1000M and Meridian 1 Large System Planning and
Engineering (NN43021-220) to prepare the equipment room and floor plan.
WARNING
A fully loaded column weighs 275 kg (606 lb). More
than one person is required to remove equipment
from shipping pallets.
WARNING
Module covers are not hinged; do not let go of the
cover. Lift the cover away from the module and set it
out of the work area.
Procedure 1
Preparing the equipment for installation
1
Remove equipment from the shipping pallets; follow the unpacking
instructions that come with the packaging material.
2
Remove the front and rear covers from each module: