Introduction
Contents
Meridian 1 Option 61C upgrade to Option 61C CP PIV
This chapter contains the following topics:
Meridian 1 Option 61C upgrade to Option 61C CP PIV . . . . . . . . . . .
This document provides instructions for upgrading a source Meridian 1
Option 61C CP3, CP4 to a target platform of Meridian 1 Option 61C CP PIV.
The procedures in this section are written for a stacked configuration (Core/
Net 1 on top of Core/Net 0).
Note: For side-by-side configuration, additional equipment such as the
pedestal, top cap, shelf spacers, or NT4N41 module, and XSM cables
must be ordered separately. This equipment must be installed before
attempting this upgrade. All existing cables in Core/Net 1 must be
checked for proper length and routing to the new configuration.
Please see Communication Server 1000M and Meridian 1 Large System
Installation and Commissioning (NN43021-310) for instructions on how to
install a column.
Procedures are written with the intent to maintain partial service. The service
interruption will cause half the system to be down during most of the
procedure. Some thought should be given to a complete power down
hardware replacement process.
61C to CS 1000M SG CP PIV Upgrade
Page 21 of 212