Test Core/Net 1 - Avaya 1000M Upgrade

Cs 1000m sg cp piv
Table of Contents

Advertisement

Page 128 of 212

Test Core/Net 1

NN43021-461
Standard 06.03
Performing the upgrade
5
Wait for the system to load and initialize.
Core/Net 1 is now active. All network cards in Core/Net 0
and Core/Net 1 are enabled. Call processing is resumed.
At this point, all applications can be re-started (Avaya
CallPilot, Symposium, and so on). LAN 1 and LAN 2
cables are now connected.
Procedure 39
Testing Core/Net 1
1
Check dial-tone.
2
Test the clocks:
a.
Verify that the clock controller is assigned to the active Core.
LD 60
SSCK x
SWCK
****
b.
Verify that the clock controllers are switching correctly.
SWCK
June 2014
End of Procedure
Load program
Obtain the status of the clock controllers (x is "0"
or "1" for Clock 0 or Clock 1)
To switch the Clock (if necessary)
Exit program
Switch the Clock
Note: You must wait a minimum of one minute for
clocks to synchronize.